Job route selection model for workload balancing between workstations in flexible flow line

被引:7
作者
Ham, HS
机构
[1] Division of Integrated Production System, System Engineering Research Institute, Korea Institute of science and Technology, Taejon, 305333, 1 Oeun-Dong, Yuseong-Ku
关键词
flexible flow line; workload balancing; job route selection; heuristic search;
D O I
10.1080/09537289608930371
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A flexible now line (FFL) consists of several groups of identical machines. All work-orders flow along the same path through successive machine groups. Thus, the balancing of workloads between machine groups in order to maximize total productivity is emphasized. On the other hand, many different types of work-orders, in varying batch or lot sizes, are produced simultaneously. The mix of work-orders, their lot sizes, and the sequence in which they are produced affect the workload. However, the work-orders and their lot sizes are pre-fixed and cannot be changed. Because of these reasons, an optimal route selection model has been developed using heuristic search and a min-max algorithm for balancing the workload between machine groups in the FFL.
引用
收藏
页码:430 / 438
页数:9
相关论文
共 13 条
[1]   A SIMULATION-BASED SCHEDULER FOR FLEXIBLE FLOWLINES [J].
BENGU, G .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (02) :321-344
[2]   GROUP SET-UP FOR PRINTED-CIRCUIT BOARD ASSEMBLY [J].
CARMON, TF ;
MAIMON, OZ ;
DAREL, EM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (10) :1795-1810
[3]  
Deane R. H., 1992, International Journal of Flexible Manufacturing Systems, V4, P217, DOI 10.1007/BF01324881
[4]   DESIGN AND SCHEDULING OF FLEXIBLE ASSEMBLY LINES FOR PRINTED-CIRCUIT BOARDS [J].
DESSOUKY, MM ;
ADIGA, S ;
PARK, K .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1995, 33 (03) :757-775
[5]  
Hillier F.S., 1990, Introduction to operations research, V5th ed.
[6]   ENGINEERING A CIRCUIT-BOARD ASSEMBLY LINE FOR A DESIRED CAPACITY AND FLOWTIME [J].
JOHRI, PK .
JOURNAL OF MANUFACTURING SYSTEMS, 1991, 10 (06) :492-500
[7]   HEURISTIC METHODS FOR FLEXIBLE FLOW LINE SCHEDULING [J].
KOCHHAR, S ;
MORRIS, RJT .
JOURNAL OF MANUFACTURING SYSTEMS, 1987, 6 (04) :299-314
[8]   CONTINGENCIES FOR THE DESIGN OF SCHEDULING EXPERT SYSTEMS [J].
LEE, JK ;
SUH, MS ;
FOX, MS .
EXPERT SYSTEMS WITH APPLICATIONS, 1993, 6 (03) :219-230
[9]   ROUTING PRINTED-CIRCUIT CARDS THROUGH AN ASSEMBLY CELL [J].
LOFGREN, CB ;
MCGINNIS, LF ;
TOVEY, CA .
OPERATIONS RESEARCH, 1991, 39 (06) :992-1004
[10]   GROUPING METHODS FOR PRINTED-CIRCUIT BOARD ASSEMBLY [J].
MAIMON, O ;
SHTUB, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (07) :1379-1390