Valuing Simple Multiple-Exercise Real Options in Infrastructure Projects

被引:111
作者
Chiara, Nicola [2 ]
Garvin, Michael J. [1 ]
Vecer, Jan [3 ]
机构
[1] Virginia Tech, Sch Construct, Blacksburg, VA 24061 USA
[2] Columbia Univ, Dept Civil Engn & Engn Mech, New York, NY 10027 USA
[3] Columbia Univ, Dept Stat, New York, NY 10027 USA
基金
美国国家科学基金会;
关键词
Build/operate/transfer; Stochastic models; Monte Carlo method; Regression analysis; Optimization; Infrastructure;
D O I
10.1061/(ASCE)1076-0342(2007)13:2(97)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The revenue risk is considerable in infrastructure project financing arrangements such as build-operate-transfer (BOT). A potential mitigation strategy for the revenue risk is a governmental revenue guarantee, where the government secures a minimum amount of revenue for a project. Such a guarantee is: (1) only redeemable at distinct points in time; and (2) more economical if the government limits the guarantee's availability to the early portions of a BOT's concession period. Hence, a guarantee characterized by this type of structure takes the form of either a Bermudan or a simple multiple-exercise real option, depending upon the number of exercise opportunities afforded. The multi-least-squares Monte Carlo technique is presented and illustrated as a promising approach to determine the fair value of this variety of real option. This method is far more flexible than prevailing approaches, so it represents an important step toward improving risk mitigation and facilitating contractual and financial negotiations in BOT projects.
引用
收藏
页码:97 / 104
页数:8
相关论文
共 30 条
[1]  
Amram M., 1999, REAL OPTIONS MANAGIN
[2]   PRICING OF OPTIONS AND CORPORATE LIABILITIES [J].
BLACK, F ;
SCHOLES, M .
JOURNAL OF POLITICAL ECONOMY, 1973, 81 (03) :637-654
[3]   Pricing American-style securities using simulation [J].
Broadie, M ;
Glasserman, P .
JOURNAL OF ECONOMIC DYNAMICS & CONTROL, 1997, 21 (8-9) :1323-1352
[4]  
Chiara N., 2006, THESIS COLUMBIA U NE
[5]   An analysis of a least squares regression method for American option pricing [J].
Clément, E ;
Lamberton, D ;
Protter, P .
FINANCE AND STOCHASTICS, 2002, 6 (04) :449-471
[6]  
COPELAND T.V. ANTIKAROV., 2001, REAL OPTIONS PRACTIT
[7]  
Dailami M., 1999, 2083 WORLD BANK
[8]  
Dixit K., 1994, INVESTMENT UNCERTAIN
[9]  
Esty BC., 1999, Journal of Project Finance, V5, P9, DOI DOI 10.3905/jsf.1999.320177
[10]  
Esty BC., 2003, MODERN PROJECT FINAN, V1