Long-term mid-term resource optimization of a hydro-dominant power system using interior point method

被引:61
作者
Christoforidis, M
Aganagic, M
Awobamise, B
Tong, S
Rahimi, AF
机构
[1] SIEMENS ENERGY & AUTOMAT,EMPROS POWER SYST CONTROL,BROOKLYN PK,MN
[2] MACRO CORP,MT VIEW,CA
[3] SCHWEIZER BUNDESBAHNEN,ZOLLIKOFEN,SWITZERLAND
关键词
resource optimization; long-term; mid-term hydro scheduling; EMS; interior point methods;
D O I
10.1109/59.486108
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper describes the modeling approach and the solution techniques that were employed in developing the Long-term/ Mid-term Resource Scheduling (LMRS) function for the power system of Schweizerische Bundesbahnen (Swiss Railways). LMRS together with the Annual Load Forecast and Annual Maintenance Scheduling functions constitute the Long-term/ Mid-term Operational Planning subsystem of Swiss Railways' new Energy Management System.