Design-build contract award methods for transportation projects

被引:28
作者
Gransberg, DD [1 ]
Senadheera, SP [1 ]
机构
[1] Univ Oklahoma, Constr Sci Div, Norman, OK 73019 USA
来源
JOURNAL OF TRANSPORTATION ENGINEERING-ASCE | 1999年 / 125卷 / 06期
关键词
D O I
10.1061/(ASCE)0733-947X(1999)125:6(565)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A nationwide survey of state Departments of Transportation (DOTs) found that 15 states are using design-build (DB) to procure highway construction projects. Analysis of their methods yielded three different systems to advertise and award DB highway projects. The methods are low-bid DB, adjusted score DB, and best value DB. The paper details the three methods and compares their strengths and weaknesses. It is concluded that each method is a valid system for procuring highway construction projects and that each method can be matched with certain project characteristics to optimize the project delivery method with respect to the salient aspects of the project.
引用
收藏
页码:565 / 567
页数:3
相关论文
共 8 条
[1]  
*CO DEP TRANSP, 1997, COL DEP TRANSP DES B
[2]  
*DBIA, 1997, SURV STAT ENG ARCH B, P6
[3]  
*DEP TRANSP, 1996, 625020010A DEP TRANS
[4]  
*DEP TRANSP, 1995, CONS MOD TURNK PROJ
[5]  
ELLIS RD, 1991, 997007435010 U FLOR
[6]  
*FHWA, 1996, DES BUILD FWHAS ROL
[7]  
*STAT GOV CONTR SP, 1997, REQ DES BUILD PROP P
[8]  
1997, FED REG, V62, P62