A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors

被引:42
作者
Brah, SA
机构
[1] Department of Decision Sciences, Faculty of Business Administration, National University of Singapore
关键词
scheduling; tardiness; flow shop with multiple processors; flexible flow lines;
D O I
10.1080/09537289608930364
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The literature on job scheduling recognizes the importance of due date performance criteria such as mean tardiness and maximum tardiness. A number of studies test a large number of sequencing rules for these criteria in job shop and now shop settings. The object of this present research is to examine the performance of some well-known priority rules in a now shop with multiple processors. This study investigates the performance of ten priority rules in terms of mean and maximum tardiness. It examines the effects of problem characteristics, such as number of jobs, number of machines stages and number of parallel processors at each stage, and the performance of priority rules using regression analysis. The findings of the study suggest that the primary determinants of tardiness-based criteria are problem characteristics. In addition, both the regression analysis and the analysis of variance provide strong evidence of the strategy-effect. Finally, a detailed performance review of examined priority rules for various problem characteristics is presented.
引用
收藏
页码:362 / 373
页数:12
相关论文
共 19 条
[1]   2 NEW RULES TO MINIMIZE TARDINESS IN A JOB SHOP [J].
ANDERSON, EJ ;
NYIRENDA, JC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (12) :2277-2292
[2]   SEQUENCING RULES AND DUE-DATE ASSIGNMENTS IN A JOB SHOP [J].
BAKER, KR .
MANAGEMENT SCIENCE, 1984, 30 (09) :1093-1104
[3]  
BARRETT RT, 1986, SIMULATION, V47, P187
[4]  
BRAH S, 1991, J INFORMATION OPTIMI, V12, P113, DOI DOI 10.1080/02522667.1991.10699055
[5]  
Brah S. A., 1988, DISS ABSTR INT B, V50, P1587
[6]   BRANCH AND BOUND ALGORITHM FOR THE FLOW-SHOP WITH MULTIPLE PROCESSORS [J].
BRAH, SA ;
HUNSUCKER, JL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 51 (01) :88-99
[7]  
BRAH SA, 1992, TIMSORSA JOINT NAT M
[8]  
BRAH SA, 1992, OPTIMIZATION TECHNIQ, V1, P538
[9]   SCHEDULES FOR A 2-STAGE HYBRID FLOWSHOP WITH PARALLEL MACHINES AT THE 2ND STAGE [J].
GUPTA, JND ;
TUNC, EA .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (07) :1489-1502
[10]   2-STAGE, HYBRID FLOWSHOP SCHEDULING PROBLEM [J].
GUPTA, JND .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1988, 39 (04) :359-364