Effectiveness of grade-control structures in reducing erosion along incised river channels: the case of Hotophia Creek, Mississippi

被引:64
作者
Simon, A
Darby, SE
机构
[1] USDA ARS, Natl Sedimentat Lab, Oxford, MS 38655 USA
[2] Univ Southampton, Dept Geog, Southampton SO17 1BJ, Hants, England
关键词
Hotophia Creek; grade-control structures; sediment yield; erosion control; applied geomorphology;
D O I
10.1016/S0169-555X(01)00088-5
中图分类号
P9 [自然地理学];
学科分类号
0705 ; 070501 ;
摘要
Herein, we undertake a geomorphological analysis in which spatial and temporal trends of bed and bank erosion along an 18-km length of Hotophia Creek, Mississippi, are estimated for the period between 1961 and 2050. The evaluation was undertaken for two scenarios of channel response to channelization during 1961 - 1963. One scenario represents the 'actual' response of the channel and includes the effects of installing a series: of grade-control structures (GCS) between 1980 and 1996, while the other represents a hypothetical scenario in which the channel is left to adjust naturally. This allows the effectiveness of GCS in reducing in-channel erosion to be assessed. The analysis relies on the availability of channel survey data to develop empirical bed and bank response models for each adjustment scenario, supplemented by bank stability modelling to predict future rates of bank erosion. Results indicate that channel erosion rates decline nonlinearly with respect to time since 1961, for both adjustment scenarios. However, by the year 2050, the "with" GCS adjustment scenario results in. the cumulative removal of some 663,000 (9%) extra tonnes of sediment relative to the "without" GCS scenario. Most (63%) of this excess is derived from enhanced bed erosion during 1976-1985 and 1985-1,992, with the remainder derived from increased bank erosion during 1985-1992. Detailed analysis of the patterns of erosion and deposition, and their association with the GCS, provides evidence to support the view that GCS installed along Hotophia Creek have, for the most part, been ineffective in reducing channel erosion rates. This is because the GCS were installed too late to prevent bed degradation, caused by the 1961 - 1963 channelization, migrating upstream. In addition, some structures have disrupted the downstream transmission of bed material from eroded reaches upstream, exacerbating bed degradation and bank erosion in incised reaches downstream. Published by Elsevier Science B.V.
引用
收藏
页码:229 / 254
页数:26
相关论文
共 64 条
  • [1] *AM SOC CIV ENG, 1975, MAN REP ENG PRACT, V54
  • [2] [Anonymous], 1984, INCISED CHANNELS MOR
  • [3] [Anonymous], RIVER CONSERVATION M
  • [4] [Anonymous], 1982, HILLSLOPE MAT PROCES
  • [5] [Anonymous], 1993, Channel Network Hydrology
  • [6] BIEDENHARN DS, 1983, RIVER MEANDERING, P500
  • [7] BLACKMARR WA, 1995, 3 US DEP AGR NAT SED
  • [8] SCOUR DOWNSTREAM OF GRADE-CONTROL STRUCTURES
    BORMANN, NE
    JULIEN, PY
    [J]. JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 1991, 117 (05): : 579 - 594
  • [9] Bravard JP, 1999, INCISED RIVER CHANNELS: PROCESSES, FORMS, ENGINEERING, AND MANAGEMENT, P303
  • [10] Tributary-trunk stream relations in a cut-and-fill landscape: a case study from Wolumla catchment, New South Wales, Australia
    Brierley, GJ
    Fryirs, K
    [J]. GEOMORPHOLOGY, 1999, 28 (1-2) : 61 - 73