DEMO maintenance scenarios: Scheme for time estimations and preliminary estimates for blankets arranged in multi-module segments

被引:7
作者
Nagy, D. [1 ]
Ihli, T. [2 ]
Filsinger, D. [3 ]
Gottfried, R. [4 ]
机构
[1] KFKI Res Inst Particle & Nucl Phys, EURATOM Assoc, HAS, H-1525 Budapest, Hungary
[2] Forschungszentrum Karlsruhe, Inst Reactor Safety, D-76021 Karlsruhe, Germany
[3] Forschungszentrum Karlsruhe, Inst Nucl & Energy Technol, D-76021 Karlsruhe, Germany
[4] AREVA NP GmbH, D-91050 Erlangen, Germany
关键词
Blanket; Maintenance; MMS; Time estimation; Corridor; Cask;
D O I
10.1016/j.fusengdes.2008.05.033
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The paper presents a comprehensive maintenance scheme for the multi-module segments (MMSs) blanket complete with machine concepts, logistics and flexible time estimations. The main features of this scenario are: two upper, vertically arranged maintenance ports have to be opened for blanket maintenance on opposite sides of the tokamak. The MMSs are removed and inserted through both ports which are handled in parallel and independently. Inside the vessel maximum four in-vessel machines are operating to transport the elements in toroidal direction and also to insert and attach the MMS to the shield. Outside the vessel the elements have to be transported between the tokamak and the hot cell (also with two ports) either in casks or through a corridor. For this scenario corresponding maintenance times were calculated utilizing the industrial experience of Areva NP. The paper presents preliminary time estimates for the cask scenario as well as the corridor concept. and the obtained results show good potential for a high availability reactor. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:1870 / 1873
页数:4
相关论文
共 3 条
[1]  
*EFDA, 2004, EFDARPRE50 PPCS
[2]  
IHLI T, 2006, RECENT PROGR DEMO FU
[3]  
*ITER, 1010713R10 ITER GAO