Planning reservoir operations with imprecise objectives

被引:76
作者
Fontane, DG [1 ]
Gates, TK [1 ]
Moncada, E [1 ]
机构
[1] AGRARIAN UNIV LA MOLINA,DEPT LAND & WATER RESOUR,LIMA,PERU
来源
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE | 1997年 / 123卷 / 03期
关键词
D O I
10.1061/(ASCE)0733-9496(1997)123:3(154)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Imprecise and noncommensurable objectives for reservoir operation are addressed through fuzzy dynamic programming using an implicit stochastic approach. Fuzzy membership functions for evaluating the achievement of a linguistically described operational goal and linguistically described constraints are estimated from surveys of decision makers, Summary statistics of the membership function values for optimal operation provide easily interpreted measures of degree of satisfaction among diverse objectives. An example application to the proposed Grey Mountain Reservoir on the Cache la Poudre River in northern Colorado showed that the expected degree of satisfaction for water supply objectives (constraints) would exceed 70% in six of 12 months, while 90% satisfaction of the flood control objective could be expected throughout the year, Expected degrees of satisfaction for storage, recreational, fish habitat, and hydropower objectives are substantially lower, Relative variability in predicted degrees of satisfaction is high. The average composite degree of satisfaction for the project is moderate, has a general seasonal trend, and is substantially variable in late summer and early fall.
引用
收藏
页码:154 / 162
页数:9
相关论文
共 33 条
  • [1] [Anonymous], 1992, NEURAL NETWORKS FUZZ
  • [2] QUALITY AND UNCERTAINTY ASSESSMENT OF WILDLIFE HABITAT WITH FUZZY-SETS
    AYYUB, BM
    MCCUEN, RH
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1987, 113 (01): : 95 - 109
  • [3] BARDOSSY A, 1992, MONOGRAPH SER AM WAT, V18, P63
  • [4] Bardossy A., 1995, Fuzzy Rule-Based Modeling with applications to Geophysical, Biological and Engineering Systems
  • [5] Bertsekas D. P., 2005, Dynamic programming and optimal control, V1
  • [6] REGIONAL MANAGEMENT OF AN AQUIFER FOR MINING UNDER FUZZY ENVIRONMENTAL OBJECTIVES
    BOGARDI, I
    BARDOSSY, A
    DUCKSTEIN, L
    [J]. WATER RESOURCES RESEARCH, 1983, 19 (06) : 1394 - 1402
  • [7] CCGP MODEL FOR MULTIOBJECTIVE RESERVOIR SYSTEMS
    CHANGCHIT, C
    TERRELL, MP
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1989, 115 (05): : 658 - 670
  • [8] MEMBERSHIP FUNCTION AS AN EVALUATION
    DOMBI, J
    [J]. FUZZY SETS AND SYSTEMS, 1990, 35 (01) : 1 - 21
  • [9] MULTICRITERION STRATEGIC-PLANNING FOR IMPROVED IRRIGATION DELIVERY .1. APPROACH
    GATES, TK
    HEYDER, WE
    FONTANE, DG
    SALAS, JD
    [J]. JOURNAL OF IRRIGATION AND DRAINAGE ENGINEERING, 1991, 117 (06) : 897 - 913
  • [10] Goicoechea A., 1982, Multiobjective Decision Analysis with Engineering and Business Applications