An optimization approach to capacity expansion in semiconductor manufacturing facilities

被引:52
作者
Bard, JF [1 ]
Srinivasan, K
Tirupati, D
机构
[1] Univ Texas, Grad Program Operat Res & Ind Engn, Austin, TX 78712 USA
[2] Motorola Inc, Mfg Syst, Corp Off, Schaumburg, IL 60196 USA
[3] Univ Texas, Coll Business Adm, Dept Management, Austin, TX 78712 USA
关键词
D O I
10.1080/002075499190095
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
For a given demand and planning horizon, the general facility design problem faced by semiconductor manufacturers is to decide how much capacity to build into their systems. When the technology is known and only a small number of products is to be manufactured, the specific problem is to find a tool-set configuration that minimizes the average cycle time within a prescribed budget. In this paper, it is shown that this version of the capacity expansion problem can be modelled as a nonlinear integer program in which the decision variables correspond to the number of tools at a workstation. The major difficulty encountered in trying to find solutions is that no closed form expressions exist for the waiting time, primarily due to the presence of re-entrant flow. This means that it has to be approximated. At the outset, it was observed that previously proposed approximation methods based on parametric decomposition provided extremely poor results. In response, a new set of expressions, in the form of simultaneous equations, has been devised for approximating the average waiting time in a multiserver batch queuing system. When the number of batch servers is fixed, these equations become linear and are easy to solve. This fact is exploited in the development of a series of algorithms. The first two are greedy in nature, the third is based on simulated annealing, and the fourth is an exact method centring on implicit enumeration. Each is used to solve a large sample of test problems generated from data (complied by Sematech) reflecting current technology, costs, and process routings. The results indicate that high quality solutions can br obtained with little computational effort.
引用
收藏
页码:3359 / 3382
页数:24
相关论文
共 31 条
[1]   AN ALGORITHM FOR THE MANUFACTURING EQUIPMENT SELECTION PROBLEM [J].
BARD, JF ;
FEO, TA .
IIE TRANSACTIONS, 1991, 23 (01) :83-92
[2]  
Bitran G. R., 1989, Annals of Operations Research, V17, P119, DOI 10.1007/BF02096601
[3]   TRADEOFF CURVES, TARGETING AND BALANCING IN MANUFACTURING QUEUING-NETWORKS [J].
BITRAN, GR ;
TIRUPATI, D .
OPERATIONS RESEARCH, 1989, 37 (04) :547-564
[4]   MULTIPRODUCT QUEUING-NETWORKS WITH DETERMINISTIC ROUTING - DECOMPOSITION APPROACH AND THE NOTION OF INTERFERENCE [J].
BITRAN, GR ;
TIRUPATI, D .
MANAGEMENT SCIENCE, 1988, 34 (01) :75-100
[5]   APPROXIMATIONS FOR PRODUCT DEPARTURES FROM A SINGLE-SERVER STATION WITH BATCH PROCESSING IN MULTI-PRODUCT QUEUES [J].
BITRAN, GR ;
TIRUPATI, D .
MANAGEMENT SCIENCE, 1989, 35 (07) :851-878
[6]  
CHANCE F, 1993, DELPHI C BASED MANUF
[7]  
CONNORS DP, 1994, QUEUEING NETWORK MOD
[8]  
Deuermeyer B. L., 1993, Production and Operations Management, V2, P195, DOI 10.1111/j.1937-5956.1993.tb00098.x
[9]  
DONOHUE KL, 1995, OPTIMAL DESIGN STOCH
[10]   A GRASP-STAR FOR A DIFFICULT SINGLE-MACHINE SCHEDULING PROBLEM [J].
FEO, TA ;
VENKATRAMAN, K ;
BARD, JF .
COMPUTERS & OPERATIONS RESEARCH, 1991, 18 (08) :635-643