Runoff capture and delivery curves for storm-water quality control designs

被引:53
作者
Guo, JCY [1 ]
Urbonas, B
机构
[1] Univ Colorado, Dept Civil Engn, Denver, CO 80214 USA
[2] Master Planning & S Platte River Urban Drainage &, Denver, CO 80211 USA
关键词
storm water; water quality; retention; runoff;
D O I
10.1061/(ASCE)0733-9496(2002)128:3(208)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A storm-water quality control system consists of trickle channels and water quality control basins (WQCB). To be economical, a WQCB is often designed to capture rainfall events smaller than extreme events. In current practice, the design rainfall statistics and runoff capture rates for sizing a WQCB have to be derived from the local long-term continuous rainfall record. Such a rainfall-runoff simulation process is lengthy and time-consuming. In this study, the analyses of 30- to 40-year continuous rainfall data recorded from seven metropolitan areas in the United States indicate that the frequency distribution of rainfall event-depths can be described by an exponential decay function. Applying the exponential distribution to a complete rainfall data series, the normalized runoff capture curve is derived in this study to describe the nonexceedance probability distribution of runoff depths. Similarly, the normalized runoff delivery curve is also developed to describe the nonexceedance probability distribution of runoff rates. These two curves provide necessary and important design information by which both the trickle channel and the WQCB can be sized on a consistent basis of overflow risk.
引用
收藏
页码:208 / 215
页数:8
相关论文
共 17 条
  • [1] [Anonymous], 1982, RESULTS NATIONWIDE U
  • [2] Driscoll E., 1989, Analysis of storm events characteristics for selected rainfall gauges throughout the United States
  • [3] EDIENT PB, 1992, HYDROLOGY FLOODPLAIN
  • [4] EPA, 1986, EPA440587001
  • [5] Maximized detention volume determined by runoff capture ratio
    Guo, JCY
    Urbonas, B
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1996, 122 (01): : 33 - 39
  • [6] Risk-cost approach to interim drainage structure design
    Guo, JCY
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1998, 124 (06): : 330 - 333
  • [7] Guo JCY, 1999, J IRRIG DRAIN ENG, V125, P380, DOI 10.1061/(ASCE)0733-9496(1999)125:6(380)
  • [8] Storage volume and overflow risk for infiltration basin design
    Guo, JCY
    Hughes, W
    [J]. JOURNAL OF IRRIGATION AND DRAINAGE ENGINEERING, 2001, 127 (03) : 170 - 175
  • [9] GUO JCY, 1992, STORM WATER QUALITY
  • [10] *PUBL WORKS WAT RE, 1996, SACR CIT COUNT DRAIN