Scheduling of FMSs with information delays: A simulation study

被引:25
作者
Caprihan, R [1 ]
Wadhwa, S
机构
[1] Dayalbagh Educ Inst, Dept Mech Engn, Agra 282005, Uttar Pradesh, India
[2] Indian Inst Technol, Dept Mech Engn, New Delhi 110016, India
来源
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS | 2005年 / 17卷 / 01期
关键词
information delays; routing flexibility; dynamic sequencing and dispatching; simulation; Taguchi experimental design;
D O I
10.1007/s10696-005-5993-5
中图分类号
T [工业技术];
学科分类号
08 [工学];
摘要
Practitioners and academicians throughout the world recognize the crucial role played by flexibility within manufacturing organizations, especially those engaged in small batch manufacture. However, although the concept of flexibility has begun to attract increased attention, its interaction with information integration and automation has not captured due attention. For example, it almost always has been assumed that a real-time control mechanism is available for exploiting routing flexibility on the shop floor. While this may be true for FMSs, it generally is not so for the vast majority of conventional manufacturing systems with varying levels of information integration and automation. The lack of a fully integrated and automated control mechanism within such semi-automated flexible manufacturing systems (SAFMSs) would eventually cause delays in the availability of shop status information. In this paper, we study the impact that defined modes of information delay have on the performance of a hypothetical SAFMS through detailed simulation experiments. Given that the level of routing flexibility is a controllable design parameter, our interest is in determining the impact that information delays have on decisions pertaining to the selection of appropriate levels of routing flexibility. To highlight the impact of information delays within the SAFMS, the Taguchi experimental design procedure is adopted as a performance evaluation and analysis vehicle, using makespan as a measure of performance. Simulation results indicate the presence of a system specific tolerance limit, operation below which minimizes performance loss.
引用
收藏
页码:39 / 65
页数:27
相关论文
共 54 条
[1]
[Anonymous], INT J FLEXIBLE MANUF
[2]
SCHEDULING AND CONTROL OF FLEXIBLE MANUFACTURING SYSTEMS - A CRITICAL-REVIEW [J].
BASNET, C ;
MIZE, JH .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1994, 7 (06) :340-355
[3]
THE EFFECT OF ROUTEING AND MACHINE FLEXIBILITY ON THE PERFORMANCE OF MANUFACTURING SYSTEMS [J].
BENJAAFAR, S ;
TALAVAGE, J ;
RAMAKRISHNAN, R .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1995, 8 (04) :265-276
[4]
ALTERNATE ROUTING STRATEGIES IN BATCH MANUFACTURING - AN EVALUATION [J].
BOBROWSKI, PM ;
MABERT, VA .
DECISION SCIENCES, 1988, 19 (04) :713-733
[5]
Browne J., 1984, FMS Magazine, V2, P114
[6]
On the consequences of information delays in the scheduling of semi-automated flexible machines [J].
Caprihan, R ;
Wadhwa, S ;
Kumar, S .
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 2005, 16 (03) :251-275
[7]
Fuzzy systems for control of flexible machines operating under information delays [J].
Caprihan, R ;
Kumar, S ;
Wadhwa, S .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (05) :1331-1348
[8]
Impact of routing flexibility on the performance of an FMS - A simulation study [J].
Caprihan, R ;
Wadhwa, S .
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 1997, 9 (03) :273-298
[9]
CAPRIHAN R, 1999, P POMS INT C OP MAN, P781
[10]
CAPRIHAN R, 1995, THESIS DAYALBAGH ED