A feature-based prototype system for the evaluation and optimisation of manufacturing processes

被引:15
作者
Gayretli, A [1 ]
Abdalla, HS [1 ]
机构
[1] De Montfort Univ, Dept Mech & Mfg Engn, Leicester LE1 9BH, Leics, England
关键词
concurrent engineering; process optimisation; cost estimation; knowledge-based systems; feature-based design;
D O I
10.1016/S0360-8352(99)00123-0
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The aim of this research work is to develop an intelligent design environment that enables designers to incorporate all product and process related activities into the design phase at early stages of the design process. One of the most important aspects of these activities is evaluation and optimisation of manufacturing processes. This research article focuses on developing a prototype system for manufacturing process optimisation using a combination of mathematical methods and constraint-programming techniques. This approach enables designers to evaluate and optimise feasible manufacturing processes as early as possible during the design session. This helps to avoid unexpected design iterations that cause wastage of a great amount of engineering time and effort, hence longer lead-time. The development process has passed through the following stages: firstly, the development of an intelligent design system for manufacturing process -optimisation, secondly, representation of product features, processes, cost, time and constraints; thirdly, developing the process optimisation rules for the selection of feasible processes for form features, finally, a user interface that provides designer with feedback about process selection and evaluation. (C) 1999 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:481 / 484
页数:4
相关论文
共 9 条
[1]   AN EXPERT-SYSTEM FOR CONCURRENT PRODUCT AND PROCESS DESIGN OF MECHANICAL PARTS [J].
ABDALLA, HS ;
KNIGHT, J .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 1994, 208 (03) :167-172
[2]  
DAS S, 1995, ASME, P619
[3]  
Downlatshahi S, 1997, CONCURRENT ENG-RES A, V5, P145
[4]  
Fen C.J, 1996, COMPUT AIDED DESIGN, V28, P879
[5]  
GAYRETLI A, 1998, P TMCE 98 MANCH
[6]  
Hashemian M., 1995, Concurrent Engineering: Research and Applications, V3, P177, DOI 10.1177/1063293X9500300303
[7]   AN INTEGRATED SYSTEM FOR PROCESS PLANNING AND COST ESTIMATION IN HOLE MAKING [J].
LUONG, LHS ;
SPEDDING, T .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 1995, 10 (06) :411-415
[8]   Developing an integrated framework for feature-based early manufacturing cost estimation [J].
OuYang, C ;
Lin, TS .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 1997, 13 (09) :618-629
[9]   A comparison of equality constraint formulations for concurrent design optimization [J].
Tappeta, RV ;
Renaud, JE .
CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 1997, 5 (03) :253-261