Scheduling using drum-buffer-rope in a remanufacturing environment

被引:78
作者
Guide, VDR
机构
[1] Department of Graduate Logistics Management, Graduate School of Logistics and Acquisition Management, Air Force Institute of Technology, OH, 45433-7765, Wright-Patterson AFB
关键词
D O I
10.1080/00207549608904951
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Scheduling in a remanufacturing environment is more complex and the scheduler must deal with more uncertainty than in a traditional manufacturing environment. In order to properly schedule in a remanufacturing environment the schedule must be able to cope with several complicating factors which increase variability. The schedule must be able to cope with conditional routeings, a routeing that may or may not be taken due to the condition of the unit. The schedule must also be able to cope with dependent events, e.g. operation B cannot begin until operation A is completed. Drum-buffer-rope (DBR) offers an extremely robust method of scheduling. A schedule built using DBR can take both conditional routeings and dependent events into account. A realistic example from a military depot is discussed in detail and each step required to build a schedule using DBR is explained fully. This paper also shows the results from a simulation model of DBR at a repair/rework depot which are benchmarked against the present production planning and control system.
引用
收藏
页码:1081 / 1091
页数:11
相关论文
共 10 条
[1]  
Cook D. P., 1994, Production and Inventory Management Journal, V35, P73
[2]  
Kleijnen J.P.C., 1987, STAT TOOLS SIMULATIO
[3]  
Lambrecht M., 1990, International Journal of Operations & Production Management, V10, P47, DOI 10.1108/01443579010000736
[4]  
Law A. M. E., 1991, SIMULATION MODELING
[5]   USING V-A-T ANALYSIS FOR DETERMINING THE PRIORITY AND LOCATION OF JIT MANUFACTURING TECHNIQUES [J].
LOCKAMY, A ;
COX, JF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (08) :1661-1672
[6]   MANAGING SYSTEM CONSTRAINTS - A COST UTILIZATION APPROACH [J].
RONEN, B ;
SPECTOR, Y .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (09) :2045-2061
[7]   PROCESS FLOW INDUSTRY - SCHEDULING AND CONTROL USING THEORY OF CONSTRAINTS [J].
SCHRAGENHEIM, E ;
COX, J ;
RONEN, B .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (08) :1867-1877
[8]  
Schragenheim E., 1990, Production and Inventory Management Journal, V31, P18
[9]  
Schragenheim E., 1991, Production and Inventory Management Journal, V32, P74
[10]  
UMBLE M.M., 1990, Synchronous Manufacturing