Algorithms for the car sequencing and the level scheduling problem

被引:46
作者
Drexl, A
Kimms, A
Matthiessen, L
机构
[1] Univ Kiel, Dept Business Adm, D-24098 Kiel, Germany
[2] Univ Duisburg Gesamthsch, Dept Technol & Operat Management, D-47048 Duisburg, Germany
[3] Univ Kiel, Dept Comp Sci, D-24098 Kiel, Germany
关键词
car sequencing; level scheduling; branching; bounding; computational results;
D O I
10.1007/s10951-006-7186-9
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper deals with two most important problems arising in sequencing mixed-model assembly lines. One problem is to keep the line's workstations loads as constant as possible (the,car sequencing problem') while the other is to keep the usage rate of all parts fed into the final assembly as constant as possible (the 'level scheduling problem'). The first problem is a difficult constraint-satisfaction problem while the second requires to optimize a nonlinear objective function. The contribution of this paper is twofold: First, we describe a branching scheme and bounding algorithms for the computation of feasible sequences for the car sequencing problem. Second, we present an algorithm which can optimize a level scheduling objective while taking care of the car sequencing constraints. Computational results are presented which show that feasible sequences can be obtained quickly for large problem instances.
引用
收藏
页码:153 / 176
页数:24
相关论文
共 22 条
[1]   SEQUENCING MIXED-MODEL ASSEMBLY LINES TO LEVEL PARTS USAGE AND MINIMIZE LINE LENGTH [J].
BARD, JF ;
SHTUB, A ;
JOSHI, SB .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (10) :2431-2454
[2]  
Bolat A, 1997, NAV RES LOG, V44, P419, DOI 10.1002/(SICI)1520-6750(199708)44:5<419::AID-NAV2>3.0.CO
[3]  
2-7
[4]  
DINCBAS M, 1988, P EUR C ART INT, P290
[5]   Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints [J].
Drexl, A ;
Kimms, A .
MANAGEMENT SCIENCE, 2001, 47 (03) :480-491
[6]  
DREXL A, 1995, Z BETRIEBSWIRT, V47, P1073
[7]   SEQUENCING JIT MIXED-MODEL ASSEMBLY LINES [J].
INMAN, RR ;
BULFIN, RL .
MANAGEMENT SCIENCE, 1991, 37 (07) :901-904
[8]   Sequencing in mixed model assembly lines: A genetic algorithm approach [J].
Kim, YK ;
Hyun, CJ ;
Kim, Y .
COMPUTERS & OPERATIONS RESEARCH, 1996, 23 (12) :1131-1145
[9]   On the complexity of the car sequencing problem [J].
Kis, T .
OPERATIONS RESEARCH LETTERS, 2004, 32 (04) :331-335
[10]   LEVEL SCHEDULES FOR MIXED-MODEL ASSEMBLY LINES IN JUST-IN-TIME PRODUCTION SYSTEMS [J].
KUBIAK, W ;
SETHI, S .
MANAGEMENT SCIENCE, 1991, 37 (01) :121-122