Optimal component stocking policy for assemble-to-order systems with lead-time-dependent component and product pricing

被引:8
作者
Hsu, VN [1 ]
Lee, CY
So, KC
机构
[1] George Mason Univ, Sch Management, Fairfax, VA 22030 USA
[2] Hong Kong Univ Sci & Technol, Dept Ind Engn & Logist Management, Hong Kong, Hong Kong, Peoples R China
[3] Univ Calif Irvine, Paul Merage Sch Business, Irvine, CA 92697 USA
关键词
inventory management; assemble-to-order manufacturing; optimal stocking policies; lead-time management;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Short delivery time and the efficient management of component inventories are two crucial elements that determine the competitiveness of many contract assembly manufacturers, especially in the electronics industry. In this paper, we develop and analyze an optimization model to determine the optimal stocking quantities for components of an assemble-to-order product in an environment where demand is uncertain and the price for the final product and the costs of components depend on their delivery lead times. We provide an efficient solution procedure to solve the problem in which the manufacturer must deliver the full order quantity possibly in multiple shipments. We further extend our model to the situation where the manufacturer has the option of not delivering the full quantity but instead takes the penalty for a delivery shortage. We derive some analytical results that illustrate how different model parameters affect the optimal solution and provide useful insights for managing components in the assemble-to-order environment.
引用
收藏
页码:337 / 351
页数:15
相关论文
共 35 条
[1]  
Boyaci T., 2003, Manufacturing & Service Operations Management, V5, P18, DOI 10.1287/msom.5.1.18.12757
[2]   Competition and outsourcing with scale economies [J].
Cachon, GP ;
Harker, PT .
MANAGEMENT SCIENCE, 2002, 48 (10) :1314-1333
[3]   MULTIPLE FAILURES IN A MULTIITEM SPARES INVENTORY MODEL [J].
CHEUNG, KL ;
HAUSMAN, WH .
IIE TRANSACTIONS, 1995, 27 (02) :171-180
[4]  
CHU CB, 1993, NAV RES LOG, V40, P933, DOI 10.1002/1520-6750(199312)40:7<933::AID-NAV3220400706>3.0.CO
[5]  
2-8
[6]   An optimal (Q,r) policy for a multipart assembly system under stochastic part procurement lead times [J].
Fujiwara, O ;
Sedarage, D .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 100 (03) :550-556
[7]   A simple and effective component procurement policy for stochastic assembly systems [J].
Gallien, J ;
Wein, LM .
QUEUEING SYSTEMS, 2001, 38 (02) :221-248
[8]   Leadtime-inventory trade-offs in assemble-to-order systems [J].
Glasserman, P ;
Wang, YS .
OPERATIONS RESEARCH, 1998, 46 (06) :858-871
[9]  
Gurnani H, 1996, IIE TRANS, V28, P865
[10]   Joint demand fulfillment probability in a multi-item inventory system with independent order-up-to policies [J].
Hausman, WH ;
Lee, HL ;
Zhang, AX .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 109 (03) :646-659