Determination of recovery effort for a probabilistic recovery system under various inventory control policies

被引:21
作者
Bayindir, ZP
Dekker, R
Porras, E
机构
[1] Univ Florida, Dept Ind & Syst Engn, Gainesville, FL 32611 USA
[2] Erasmus Univ, Econmetr Inst, NL-3000 DR Rotterdam, Netherlands
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 2006年 / 34卷 / 06期
关键词
probabilistic recovery; inventory control;
D O I
10.1016/j.omega.2005.01.015
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this study we investigate the desired level of recovery under various inventory control policies when the success of recovery is probabilistic. All the used and returned items go into a recovery process that is modelled as a single stage operation. The recovery effort is represented by the expected time spent for it. The effect of increasing recovery effort on the success probability together with unit cost of the operation is included by assuming general forms of dependencies. Alternative to recovered items, demand is satisfied by brand-new items. Four inventory control policies that differ in timing of and information used in purchasing decision are proposed. The objective is to find the recovery level together with inventory control parameter that minimize the long-run average total cost. A numerical study covering a wide range of system parameters is carried out. Finally computational results are presented with their managerial implications. (c) 2005 Elsevier Ltd. All rights reserved.
引用
收藏
页码:571 / 584
页数:14
相关论文
共 8 条
[1]  
DEBRITO MP, 2004, THESIS ERASMUS U ROT
[2]  
Ferrer G, 2003, EUR J OPER RES, V149, P540, DOI [10.1016/S0377-2217(02)00454-X, 10.1016/SO377-2217(02)00454-X]
[3]  
Kleinrock L., 1975, Queuing Systems, VI
[4]  
Law A. M. E., 1991, SIMULATION MODELING
[5]  
RIJNEVELD A, 2001, THESIS ERASMUS U ROT
[6]   On the non-optimality of the average cost approach for inventory models with remanufacturing [J].
Teunter, R ;
van der Laan, E .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 79 (01) :67-73
[7]   How to set the holding cost rates in average cost inventory models with reverse logistics? [J].
Teunter, RH ;
van der Laan, E ;
Inderfurth, K .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2000, 28 (04) :409-415
[8]   An NPV and AC analysis of a stochastic inventory system with joint manufacturing and remanufacturing [J].
van der Laan, E .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 81-2 :317-331