共 20 条
[1]
[Anonymous], 2010, Dynamic programming
[2]
ARCADE SH, 1993, OMEGA, V6, P709
[4]
Bomberger E. E., 1966, MANAGE SCI, V12, P778, DOI DOI 10.1287/MNSC.12.11.778
[7]
ITERATIVE PROCEDURE FOR SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1973, 20 (01)
:50-55
[8]
MULTI-PRODUCT BATCH-PRODUCTION ON A SINGLE-MACHINE - A PROBLEM REVISITED
[J].
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE,
1985, 13 (05)
:453-468