An optimal algorithm for the basic period approach to the economic lot scheduling problem

被引:30
作者
Grznar, J
Riggle, C
机构
[1] UNIV TAMPA,DEPT COMP INFORMAT SYST,TAMPA,FL 33606
[2] KENT STATE UNIV,KENT,OH 44242
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 1997年 / 25卷 / 03期
关键词
batch production; inventory control; nonlinear programming; optimization; scheduling;
D O I
10.1016/S0305-0483(96)00056-4
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper develops a global optimum solution to the Economic Lot Scheduling Problem (ELSP) using the restrictions of the basic period approach as originally formulated by Bomberger. The ELSP is a classic problem in production which involves scheduling multiple products on a single facility, with the restriction that no two products may be produced at the same time. Ideally, a manufacturer could generate a schedule which would minimize the sum of setup and holding costs, but the complexities involved have so far precluded the attainment of such an ideal. This article presents a real time solution method for practical sized problems using the basic period version of the ELSP. The authors believe this is the first global optimal algorithm for the basic period ELSP to be presented in the literature. It is anticipated that future research will extend the idea presented in this article to cover more general approaches to the ELSP. (C) 1997 Elsevier Science Ltd.
引用
收藏
页码:355 / 364
页数:10
相关论文
共 20 条
[1]  
[Anonymous], 2010, Dynamic programming
[2]  
ARCADE SH, 1993, OMEGA, V6, P709
[4]  
Bomberger E. E., 1966, MANAGE SCI, V12, P778, DOI DOI 10.1287/MNSC.12.11.778
[5]   ECONOMIC LOT SCHEDULING FOR MULTIPLE PRODUCTS ON PARALLEL IDENTICAL PROCESSORS [J].
CARRENO, JJ .
MANAGEMENT SCIENCE, 1990, 36 (03) :348-358
[6]   THE ECONOMIC LOT-SCHEDULING PROBLEM - ACHIEVING FEASIBILITY USING TIME-VARYING LOT SIZES [J].
DOBSON, G .
OPERATIONS RESEARCH, 1987, 35 (05) :764-771
[7]   ITERATIVE PROCEDURE FOR SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM [J].
DOLL, CL ;
WHYBARK, DC .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 20 (01) :50-55
[8]   MULTI-PRODUCT BATCH-PRODUCTION ON A SINGLE-MACHINE - A PROBLEM REVISITED [J].
EILON, S .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1985, 13 (05) :453-468
[9]   ECONOMIC LOT SCHEDULING PROBLEM (ELSP) - REVIEW AND EXTENSIONS [J].
ELMAGHRABY, SE .
MANAGEMENT SCIENCE, 1978, 24 (06) :587-598