Risk assessment of highways affected by debris flows in Wenchuan earthquake area

被引:46
作者
Cui Peng [1 ]
Xiang Ling-zhi [2 ]
Zou Qiang [1 ,3 ,4 ]
机构
[1] Chinese Acad Sci, Inst Mt Hazards & Environm, Key Lab Mt Hazards & Earth Surface Proc, Chengdu, Peoples R China
[2] Chongqing Jiaotong Univ, Chongqing, Peoples R China
[3] Chinese Acad Sci, Grad Univ, Beijing, Peoples R China
[4] Southwest Univ Sci & Technol, Coll Environm & Resource, Chongqing, Peoples R China
基金
中国国家自然科学基金;
关键词
Debris flow; Highway disaster; Hazard analysis; Vulnerability analysis; Risk analysis; Wenchuan earthquake;
D O I
10.1007/s11629-013-2575-y
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Since the Wenchuan earthquake in China on May 12(th), 2008, highways in earthquake-affected areas have been frequently interrupted by debris flows. We analyzed the hazard effect modes and damage processes along highways and developed three key indexes, scale of debris flows, deposits on highways and river blockage, to describe quantitatively the highway disasters. By combining the empirical methods and the actual terrain conditions, we proposed new methods to determine the value of hazard indexes. In addition, we used the economic value and resistance of highway as vulnerability assessment indexes, then determined the specific subindexes for the subgrade, bridges and culverts, and developed a way for the quantified vulnerability zoning. Moreover, we proposed the assessment and mapping methods for highway risk. The risk is described into 5 grades: extremely low risk, low risk, middle risk, high risk and extremely high risk. We applied these methods in a case study carried out on provincial highway S303 from Yingxiu Town to Wolong Town, in Wenchuan County. Analysis of debris flow risk for the whole highway, showed that the total length of highway in extremely low risk area was 28.26 km, 4.83 km in low risk area, 8.0 km in middle risk area, 3.65 km in high risk area, and 3.06 km in extremely high risk area. The assessment results are consistent with the field survey data which reflected the disaster situation. This risk method can be used objectively to evaluate the debris-flow risk along highways, and is useful for highway reconstruction in mountainous areas suffering from active debris flows.
引用
收藏
页码:173 / 189
页数:17
相关论文
共 25 条
[1]  
[Anonymous], J MOUNTAIN SCI, V24, P580
[2]   Example of a debris-flow risk analysis from Vancouver Island, British Columbia, Canada [J].
Arksey, Ron ;
VanDine, Doug .
LANDSLIDES, 2008, 5 (01) :121-126
[3]  
Australian Geomechnics Society Landslide Zoning Working Group, 2007, Aust Geomech Soc, V42, P1
[4]  
Budetta P., 2002, B ENG GEOL ENVIRON, V61, P293, DOI [10.1007/s10064-002-0161-6, DOI 10.1007/S10064-002-0161-6]
[5]   Calculation of the debris flow concentration based on clay content [J].
Chen, NS ;
Cui, P ;
Liu, ZG ;
Wei, FQ .
SCIENCE IN CHINA SERIES E-TECHNOLOGICAL SCIENCES, 2003, 46 :163-174
[6]  
Cui P, 2003, P 3 INT C DEBR FLOW, P1281
[7]   Prediction of Debris-flow Danger Area by Combining Hydrological and Inundation Simulation Methods [J].
Cui Peng ;
Hu Kaiheng ;
Zhuang Jianqi ;
Yang Yu ;
Zhang Jianqiang .
JOURNAL OF MOUNTAIN SCIENCE, 2011, 8 (01) :1-9
[8]  
Cui Peng, 2010, Journal of Sichuan University, V42, P10
[9]   The 12 May Wenchuan earthquake-induced landslide lakes: distribution and preliminary risk evaluation [J].
Cui, Peng ;
Zhu, Ying-yan ;
Han, Yong-shun ;
Chen, Xiao-qing ;
Zhuang, Jian-qi .
LANDSLIDES, 2009, 6 (03) :209-223
[10]   Statistical analysis of landslide events in Central America and their run-out distance [J].
Devoli G. ;
De Blasio F.V. ;
Elverhøi A. ;
Høeg K. .
Geotechnical and Geological Engineering, 2009, 27 (1) :23-42