Multi-objective trade-offs between cost and reliability in the replacement of water mains

被引:86
作者
Dandy, GC [1 ]
Engelhardt, MO
机构
[1] Univ Adelaide, Sch Civil & Environm Engn, Ctr Appl Modeling Water Engn, Adelaide, SA 5005, Australia
[2] SEAMS, Sheffield S1 4BA, S Yorkshire, England
关键词
D O I
10.1061/(ASCE)0733-9496(2006)132:2(79)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Two of the main performance criteria of a water distribution system are that it is inexpensive to construct, operate, and maintain and that it operates in a reliable manner. These two criteria are often conflicting, thus implying that the decision maker needs to reach a compromise in scheduling mains for replacement. One way to facilitate this decision is to generate a trade-off surface that represents the compromise between the two objectives. This paper demonstrates the use of genetic algorithms to generate trade-off curves between cost and reliability for pipe replacement decisions. Curves for two planning scenarios are generated. The first identifies the trade-offs necessary for the Current conditions. The second allows the water authority to determine the required levels of future expenditure, given funding constraints, to meet a specified level of service over the entire planning horizon. Alternatively, it provides an estimate of the impact on performance of delaying expenditure.
引用
收藏
页码:79 / 88
页数:10
相关论文
共 41 条
[1]  
Anderson JM, 1998, IEE CONF PUBL, P186
[2]   A NEW METHODOLOGY FOR MODELING BREAK FAILURE PATTERNS IN DETERIORATING WATER DISTRIBUTION-SYSTEMS - THEORY [J].
ANDREOU, SA ;
MARKS, DH ;
CLARK, RM .
ADVANCES IN WATER RESOURCES, 1987, 10 (01) :2-10
[3]   A NEW METHODOLOGY FOR MODELING BREAK FAILURE PATTERNS IN DETERIORATING WATER DISTRIBUTION-SYSTEMS - APPLICATIONS [J].
ANDREOU, SA ;
MARKS, DH ;
CLARK, RM .
ADVANCES IN WATER RESOURCES, 1987, 10 (01) :11-20
[4]  
[Anonymous], 1989, GENETIC ALGORITHM SE
[5]  
Baker J. E., 1985, Proceedings of the International Conference on Genetic Algorithms and their Applications, P101
[6]   RELIABILITY IMPROVEMENTS IN DESIGN OF WATER DISTRIBUTION NETWORKS RECOGNIZING VALVE LOCATION [J].
BOUCHART, F ;
GOULTER, I .
WATER RESOURCES RESEARCH, 1991, 27 (12) :3029-3040
[7]  
Clark RM., 1982, Journal of the Water Resources Planning Management Division, ASCE, V108, P243
[8]   OPTIMIZATION-AVAILABILITY-BASED DESIGN OF WATER-DISTRIBUTION NETWORKS [J].
CULLINANE, MJ ;
LANSEY, KE ;
MAYS, LW .
JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 1992, 118 (03) :420-441
[9]   Optimal scheduling of water pipe replacement using genetic algorithms [J].
Dandy, GC ;
Engelhardt, M .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 2001, 127 (04) :214-223
[10]   RELIABILITY-ANALYSIS OF PUMPING SYSTEMS [J].
DUAN, N ;
MAYS, LW .
JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 1990, 116 (02) :230-248