Management and construction of the Three Gorges Project

被引:23
作者
Dai, Huichao
Cao, Guangjing
Su, Huaizhi [1 ]
机构
[1] China Three Gorges Project Dev Corp, Yichang 443002, Peoples R China
[2] Hohai Univ, Coll Water Conservancy & Hydropower Engn, Nanjing 210098, Jiangsu Prov, Peoples R China
关键词
Construction management; Contract management; Project management; Water resources;
D O I
10.1061/(ASCE)0733-9364(2006)132:6(615)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The owner-responsibility system is conducted for implementation of the Three Gorges Project (TGP). For the construction management of the project, the contracting system, the contract administration system, and the construction supervision system are executed for the project management. Contractors for civil projects are determined through bidding and contracting. The permanent equipment and construction materials are purchased through bidding. Some of large-sized construction machines and mechanical and electrical equipment are procured by the international competitive bids. Qualified engineers from qualified engineering bodies, scientific research organizations. and construction companies are selected for the construction supervision. This paper covers the construction of the TGP in some detail, particularly the main dam structure, diversion work, the construction program, and management, project cost, and financing.
引用
收藏
页码:615 / 619
页数:5
相关论文
共 4 条
[1]  
DAI HC, 2003, INT J WATER POWER DA, V55, P10
[2]  
DAI HC, 2003, ADV SCI TECHNOLOGY W, V23, P17
[3]  
DAI HC, 2002, J HYDRAUL ENG-ASCE, V33, P91
[4]  
[张超然 Zhang Chaoran], 2003, [中国工程科学, Engineering science], V5, P20