Small Modular Infrastructure

被引:63
作者
Dahlgren, Eric [1 ]
Goecmen, Caner [2 ]
Lackner, Klaus [1 ]
van Ryzin, Garrett [2 ]
机构
[1] Columbia Univ, Lenfest Ctr Sustainable Energy, New York, NY USA
[2] Columbia Univ, Grad Sch Business, New York, NY 10027 USA
基金
美国国家科学基金会;
关键词
SCALE; ECONOMIES; COST; TECHNOLOGY; HYDROGEN; FUTURE; GROWTH; ENERGY; PLANT;
D O I
10.1080/0013791X.2013.825038
中图分类号
F [经济];
学科分类号
02 ;
摘要
In this article we argue that advances made in automation, communication, and manufacturing portend a dramatic reversal of the bigger is better approach to cost reductions prevalent in many basic infrastructure industries; for example, transportation, electric power generation, and raw material processing. We show that the traditional reductions in capital costs achieved by scaling up in size are generally matched by learning effects in the mass production process when scaling up in numbers instead. In addition, using the U.S. electricity generation sector as a case study, we argue that the primary operating cost advantage of large unit scale is reduced labor, which can be eliminated by employing low-cost automation technologies. Finally, we argue that locational, operational, and financial flexibilities that accompany smaller unit scale can reduce investment and operating costs even further. All of these factors combined imply that with current technology, economies of numbers may well dominate economies of unit scale. Yet realizing the full potential of small unit scale will require technologists and business leaders to develop a new ability to think small.
引用
收藏
页码:231 / 264
页数:34
相关论文
共 84 条
[1]   Reactors Redux [J].
Adee, Sally ;
Guizzo, Erico .
IEEE SPECTRUM, 2010, 47 (08) :26-33
[2]  
AESI Inc, 2011, PROV BIOM GAS SOL AE
[3]  
Akzo Nobel N. V., 2011, REMOTE CONTROLLED CH
[4]  
[Anonymous], 2010, ECONOMIST
[5]  
[Anonymous], 2011, World Nuclear News
[6]  
[Anonymous], 2011, MIN COMM SUMM 2011
[7]  
[Anonymous], 1997, European Business Review, DOI DOI 10.1108/09555349710156046
[8]  
[Anonymous], TECHNICAL REPORT
[9]  
[Anonymous], 2010, UPD CAP COST EST EL
[10]  
[Anonymous], 2011, Applications of HPM