Optimal Expansion Planning of Energy Hub With Multiple Energy Infrastructures

被引:415
作者
Zhang, Xiaping [1 ]
Shahidehpour, Mohammad [1 ,2 ]
Alabdulwahab, Ahmed [2 ]
Abusorrah, Abdullah [2 ]
机构
[1] IIT, Galvin Ctr Elect Innovat, Chicago, IL 60616 USA
[2] King Abdulaziz Univ, Renewable Energy Res Grp, Jeddah 21589, Saudi Arabia
关键词
Combined heat and power (CHP); energy hubs; expansion planning; multiple energy systems (electricity; natural gas; heat); NATURAL-GAS;
D O I
10.1109/TSG.2015.2390640
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents an optimal expansion planning model for an energy hub with multiple energy systems. Energy hub represents a coupling among various energy infrastructures for supplying electricity, natural gas, and heating loads. Combined heat and power (CHP) and natural gas furnaces are considered within the energy hub to convert energy into other forms. The multiple energy system planning problem would optimally determine appropriate investment candidates for generating units, transmission lines, natural gas furnaces, and CHPs that satisfy electricity and heating load forecasts and hub system constraints. The system performances associated with reliability, energy efficiency, and emission matrices is evaluated for the identified planning schedules. Numerical simulations demonstrate the effectiveness of the proposed multiple energy system expansion planning approach based on energy hub.
引用
收藏
页码:2302 / 2311
页数:10
相关论文
共 19 条
[1]   On Decisive Storage Parameters for Minimizing Energy Supply Costs in Multicarrier Energy Systems [J].
Adamek, Franziska ;
Arnold, Michele ;
Andersson, Goeran .
IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2014, 5 (01) :102-109
[2]  
[Anonymous], 2011, 24 NERC IVG TF
[3]  
[Anonymous], 2009, INT J INTEGRATED ENE
[4]  
[Anonymous], 2014, Annual Energy Outlook
[5]  
Bezerra B., 2006, S P SPEC EL OP EXP P, P1
[6]   Modeling and design of future multi-energy generation and transmission systems [J].
Favre-Perrod, Patrick ;
Kienzle, Florian ;
Andersson, Goeran .
EUROPEAN TRANSACTIONS ON ELECTRICAL POWER, 2010, 20 (08) :994-1008
[7]  
Geidl M., 2007, Power Syst. Lab.
[8]   Optimal power flow of multiple energy carriers [J].
Geidl, Martin ;
Andersson, Goeran .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2007, 22 (01) :145-155
[9]   Operational and structural optimization of multi-carrier energy systems [J].
Geidl, Martin ;
Andersson, Goeran .
EUROPEAN TRANSACTIONS ON ELECTRICAL POWER, 2006, 16 (05) :463-477
[10]  
Hubner Michael, 2008, 2008 5th International Conference on the European Electricity Market (EEM 2008), P1, DOI 10.1109/EEM.2008.4579119