Age-based hybrid model for imperfect preventive maintenance

被引:66
作者
El-Ferik, S [1 ]
Ben-Daya, M [1 ]
机构
[1] King Fahd Univ Petr & Minerals, Dept Syst Engn, Dhahran 31261, Saudi Arabia
关键词
D O I
10.1080/07408170500232545
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Several sequential Preventive Maintenance ( PM) models for predetermined PM interval policies currently exist in the literature, however, much less effort has been devoted to age-based policies. The purpose of this paper is to develop a hybrid age-based model for imperfect PM involving maintainable and non-maintainable failure modes. The proposed hybrid model incorporates adjustment factors in both the hazard rate and effective age. PM is assumed to be imperfect. It reduces the age of the system and changes its hazard rate. The system undergoes a certain number of such PM actions before replacement. The problem is to determine the number of PM actions and the length of PM intervals that minimize the total long-term expected cost per unit time. Model analysis relating to the existence and uniqueness of optimal solutions is provided. Numerical examples are presented for illustrative purposes.
引用
收藏
页码:365 / 375
页数:11
相关论文
共 9 条
[1]  
Barlow RE, 1965, MATH THEORY RELIABIL
[2]  
ELFERIK S, 2003, P 2 INT C SIGN SYST, P187
[3]  
ELFERIK S, 2004, FT0204 KING FAHD U P
[4]  
Lin D., 2000, International Journal of Reliability, Quality and Safety Engineering, V7, P253, DOI DOI 10.1142/S0218539300000213
[5]  
Lin DM, 2001, NAV RES LOG, V48, P172, DOI 10.1002/1520-6750(200103)48:2<172::AID-NAV5>3.0.CO
[6]  
2-5
[7]   SEQUENTIAL IMPERFECT PREVENTIVE MAINTENANCE POLICIES [J].
NAKAGAWA, T .
IEEE TRANSACTIONS ON RELIABILITY, 1988, 37 (03) :295-298
[8]   OPTIMAL PREVENTIVE MAINTENANCE POLICIES FOR REPAIRABLE SYSTEMS [J].
NGUYEN, DG ;
MURTHY, DNP .
OPERATIONS RESEARCH, 1981, 29 (06) :1181-1194
[9]   Imperfect maintenance [J].
Pham, H ;
Wang, HZ .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 94 (03) :425-438