Supply contract with bidirectional options: The buyer's perspective

被引:105
作者
Wang, QZ [1 ]
Tsao, DB [1 ]
机构
[1] Tokyo Inst Technol, Dept Ind Engn & Management, Tokyo 1528550, Japan
关键词
supply contract; real options; quantity flexibility; forecast update;
D O I
10.1016/j.ijpe.2005.05.005
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper develops a single-period two-stage supply contract with bidirectional options by which the buyer can adjust the initial order both upward and downward. At the beginning of the planning horizon, the buyer places an initial order and purchases options. After updating the demand forecast, the buyer exercises options to adjust the initial order. We analyze the contract from the buyer's perspective and formulate the buyer's optimal policies. In particular, we obtain closed-form formulae to describe the buyer's optimal behavior when the demand is uniformly distributed. We also analyze how the parameters affect the buyer's behavior and prove numerically that using bidirectional options can improve the buyer's profit. (c) 2005 Elsevier B.V. All rights reserved.
引用
收藏
页码:30 / 52
页数:23
相关论文
共 32 条
[1]  
ABERNATHY FH, 1999, STICH TIME
[2]   Approximations for multiproduct contracts with stochastic demands and business volume discounts: single supplier case [J].
Anupindi, R ;
Bassok, Y .
IIE TRANSACTIONS, 1998, 30 (08) :723-734
[3]  
ANUPINDI R, 1998, QUANTITATIVE MODELS
[4]  
Barnes-Schuster D., 2002, Manufacturing & Service Operations Management, V4, P171, DOI 10.1287/msom.4.3.171.7754
[5]   Analysis of supply contracts with total minimum commitment [J].
Bassok, Y ;
Anupindi, R .
IIE TRANSACTIONS, 1997, 29 (05) :373-381
[6]  
BASSOK Y, 1997, ANAL SUPPLY CONTRACT
[7]  
BENTSSON J, 2003, WP309 LINK I TECHN D
[8]  
BENTSSON J, 2003, WP310 LINK I TECHN D
[9]   Procurement planning to maintain both short-term adaptiveness and long-term perspective [J].
Bonser, JS ;
Wu, SD .
MANAGEMENT SCIENCE, 2001, 47 (06) :769-786
[10]  
Brown A. O, 1997, OPTIMAL PAY DELAY CA