Scheduling of coupled tasks and one-machine no-wait robotic cells

被引:30
作者
Brauner, Nadia [1 ]
Finke, Gerd [1 ]
Lehoux-Lebacque, Vassilissa [1 ]
Potts, Chris [2 ]
Whitehead, Jonathan [2 ]
机构
[1] Lab G SCOP, F-38031 Grenoble, France
[2] Univ Southampton, Sch Math, Southampton SO17 1BJ, Hants, England
关键词
Coupled tasks; Robotic cells; Cyclic production;
D O I
10.1016/j.cor.2007.10.003
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Coupled task scheduling problems have been known for more than 25 years. Several complexity results have been established in the meantime, but the status of the identical task case remains still unsettled. We describe a new class of equivalent one-machine no-wait robotic cell problems. It turns out that scheduling of identical coupled tasks corresponds to the production of a single part type in the robotic cell. We shall describe new algorithmic procedures to solve this robotic cell problem, allowing lower and upper bounds on the production time and discussing in particular cyclic production plans. (C) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:301 / 307
页数:7
相关论文
共 7 条
[1]   An exact algorithm for scheduling identical coupled tasks [J].
Ahr D. ;
Békési J. ;
Galambos G. ;
Oswald M. ;
Reinelt G. .
Mathematical Methods of Operations Research, 2004, 59 (02) :193-203
[2]   Comparative evaluation of heuristic algorithms for the single machine scheduling problem with two operations per job and time-lags [J].
Gupta, JND .
JOURNAL OF GLOBAL OPTIMIZATION, 1996, 9 (3-4) :239-253
[3]  
KARP RM, 1978, DISCRETE MATH, V23, P309, DOI 10.1016/0012-365X(78)90011-0
[4]   Scheduling for a multifunction phased array radar system [J].
Orman, AJ ;
Potts, CN ;
Shahani, AK ;
Moore, AR .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (01) :13-25
[5]   On the complexity of coupled-task scheduling [J].
Orman, AJ ;
Potts, CN .
DISCRETE APPLIED MATHEMATICS, 1997, 72 (1-2) :141-154
[6]   Heuristics for a coupled-operation scheduling problem [J].
Potts, C. N. ;
Whitehead, J. D. .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2007, 58 (10) :1375-1388
[7]   SCHEDULING COUPLED TASKS [J].
SHAPIRO, RD .
NAVAL RESEARCH LOGISTICS, 1980, 27 (03) :489-498