Combined control charts for forecast-based monitoring schemes

被引:40
作者
Lin, WSW
Adams, BM
机构
[1] UNIV ALABAMA,APPL STAT PROGRAM,TUSCALOOSA,AL 35487
[2] UNIV ALABAMA,DEPT MANAGEMENT SCI & STAT,TUSCALOOSA,AL 35487
关键词
autocorrelated process; statistical process control; time series analysis;
D O I
10.1080/00224065.1996.11979679
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The problem of monitoring autocorrelated process data is considered. A Markov chain approach is used to determine the performance of several forecast-based monitoring schemes for various types of process shifts and evaluation criteria. The performance of the monitoring schemes is shown to depend on the process model, type of shift, and evaluation criteria. The combined exponentially weighted moving average-Shewhart (CES) control chart applied to appropriate one-step-ahead forecast errors is recommended for general use, and a design procedure is provided.
引用
收藏
页码:289 / 301
页数:13
相关论文
共 16 条
[1]  
ADAMS BM, 1994, TECHNOMETRICS, V36, P19
[2]   TIME-SERIES MODELING FOR STATISTICAL PROCESS-CONTROL [J].
ALWAN, LC ;
ROBERTS, HV .
JOURNAL OF BUSINESS & ECONOMIC STATISTICS, 1988, 6 (01) :87-95
[3]  
[Anonymous], 1976, TIME SERIES ANAL
[4]  
BOX G, 1992, TECHNOMETRICS, V34, P251, DOI 10.2307/1270028
[5]   DESIGN OF EXPONENTIALLY WEIGHTED MOVING AVERAGE SCHEMES [J].
CROWDER, SV .
JOURNAL OF QUALITY TECHNOLOGY, 1989, 21 (03) :155-162
[6]   STATISTICAL PROCESS-CONTROL PROCEDURES FOR CORRELATED OBSERVATIONS [J].
HARRIS, TJ ;
ROSS, WH .
CANADIAN JOURNAL OF CHEMICAL ENGINEERING, 1991, 69 (01) :48-57
[7]  
LUCAS JM, 1990, TECHNOMETRICS, V32, P1, DOI 10.2307/1269835
[8]  
MACGREGOR JF, 1988, CHEM ENG PROG, V84, P21
[9]   SOME STATISTICAL PROCESS-CONTROL METHODS FOR AUTOCORRELATED DATA [J].
MONTGOMERY, DC ;
MASTRANGELO, CM .
JOURNAL OF QUALITY TECHNOLOGY, 1991, 23 (03) :179-193
[10]   AVERAGE RUN LENGTHS FOR CUSUM CONTROL CHARTS APPLIED TO RESIDUALS [J].
RUNGER, GC ;
WILLEMAIN, TR ;
PRABHU, S .
COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 1995, 24 (01) :273-282