Industrial implementation issues of Total Site Heat Integration

被引:87
作者
Chew, Kew Hong [1 ]
Klemes, Jiri Jaromir [2 ]
Alwi, Sharifah Rafidah Wan [1 ]
Manan, Zainuddin Abdul [1 ]
机构
[1] Univ Teknol Malaysia, Fac Chem Engn, Proc Syst Engn Ctr PROSPECT, Utm Johor Baru 81310, Johor, Malaysia
[2] Univ Pannonia, Fac Informat Technol, Res Inst Chem & Proc Engn MUKKI, Ctr Proc Integrat & Intensificat, H-8200 Veszprem, Hungary
关键词
Total Site Heat Integration; Key issues; Industrial implementation; Minimum energy targets; Design; ENERGY; DESIGN; COGENERATION; TARGETS; COST; FUEL;
D O I
10.1016/j.applthermaleng.2013.03.014
中图分类号
O414.1 [热力学];
学科分类号
摘要
Heat Integration has been a well-established energy conservation strategy in the industry. Total Site Heat Integration (TSHI) has received growing interest since its inception in the 90s. The methodology has been used with certain simplifications to solve TSHI problems. This paper investigates the main issues that can influence the practical implementation of TSHI in the industry. The main aim is to provide an assessment and possible guidance for future development and extension of the TSHI methodology from the industrial perspective. Several key issues have been identified as being of vital importance for the industries: design, operation, reliability/availability/maintenance, regulatory/policy and economics. Design issues to consider include plant layout, pressure drop, etc. For operation, issues such as startup and shutdown need to be considered. Reliability, availability and maintenance (RAM) are important as they directly affect the production. Relevant government policy and incentives are also important when considering the options for TSHI. Finally, a TSHI system needs to be economically viable. This paper highlights the key issues to be considered for a successful implementation of TSHI. The impacts of these issues on TS integration are summarised in a matrix, which forms a basis for an improved and closer-to-real-life implementation of the TSHI methodology. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:17 / 25
页数:9
相关论文
共 32 条
[1]   Availability and reliability considerations in the design and optimisation of flexible utility systems [J].
Aguilar, Oscar ;
Kim, Jin-Kuk ;
Perry, Simon ;
Smith, Robin .
CHEMICAL ENGINEERING SCIENCE, 2008, 63 (14) :3569-3584
[2]  
American Petroleum Institute, 2001, REC PRACT AN DES INS
[3]   Application of Heat Recovery Loops for Improved Process Integration between Individual Plants at a Large Dairy Factory [J].
Atkins, Martin J. ;
Walmsley, Michael R. W. ;
Neale, James R. .
PRES 2011: 14TH INTERNATIONAL CONFERENCE ON PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION, PTS 1 AND 2, 2011, 25 :183-188
[4]   Targeting for cogeneration potential through total site integration [J].
Bandyopadhyay, Santanu ;
Varghese, James ;
Bansal, Vikas .
APPLIED THERMAL ENGINEERING, 2010, 30 (01) :6-14
[5]   Total-site scheduling for better energy utilization [J].
Cheung, KY ;
Hui, CW .
JOURNAL OF CLEANER PRODUCTION, 2004, 12 (02) :171-184
[6]  
DeGarmo E.P., 1997, ENG ECON, P21
[7]   TOTAL SITE TARGETS FOR FUEL, COGENERATION, EMISSIONS, AND COOLING [J].
DHOLE, VR ;
LINNHOFF, B .
COMPUTERS & CHEMICAL ENGINEERING, 1993, 17 :S101-S109
[8]   Energy recovery in petrochemical complexes through heat integration retrofit analysis [J].
Feng, Xiao ;
Pu, Jing ;
Yang, Junkun ;
Chu, Khim Hoong .
APPLIED ENERGY, 2011, 88 (05) :1965-1982
[9]   Cogeneration targeting for site utility systems [J].
Ghannadzadeh, Ali ;
Perry, Simon ;
Smith, Robin .
APPLIED THERMAL ENGINEERING, 2012, 43 :60-66
[10]   Total Site Analysis (TSA) and Exergy Analysis for Shaft Work and Associated Steam and Electricity Savings in Low Temperature Processes in Industrial Clusters [J].
Hackl, Roman ;
Harvey, Simon .
PRES 2012: 15TH INTERNATIONAL CONFERENCE ON PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION, 2012, 29 :73-78