Security-constrained optimal generation scheduling in large-scale power systems

被引:52
作者
Martínez-Crespo, J
Usaola, J
Fernández, JL
机构
[1] Univ Carlos III Madrid, Dept Elect Engn, Madrid 28911, Spain
[2] Regulat Dept, Red Elect Espana, Madrid 28109, Spain
关键词
Benders decomposition; electricity markets; mixed-integer nonlinear optimization problem; power system dispatch; preventive security analysis;
D O I
10.1109/TPWRS.2005.860942
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents an approach to determine the optimal daily generation scheduling based on the Spanish electricity market rules. The Spanish power system considers the pool-based daily market and the technical constraints resolution as two different and consecutive processes. After the daily market has been cleared, a centralized constraints resolution process is applied to this initial scheduling through the redispatch of previously matched energy. In this paper, an algorithm based on Benders decomposition, arranged in three levels, is proposed to solve the technical constraints solution process in order to define a preventive secure dispatch. The constraints resolution process includes a full ac network and security model. This method determines the active power committed to each generating unit so as to minimize the energy redispatch cost subject to dispatch, network, and security constraints. The solution also provides the reactive power output of the generating units, the value of the transformers taps, and the committed voltage control devices. The model has been tested in an actual example of the Spanish power system. Some relevant results are reported.
引用
收藏
页码:321 / 332
页数:12
相关论文
共 22 条
[1]   Multiperiod optimal power flow using benders decomposition [J].
Alguacil, N ;
Conejo, AJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (01) :196-201
[2]  
[Anonymous], J OPT THEORY APPL
[3]   THE GENERALIZED UNIT COMMITMENT PROBLEM [J].
BALDICK, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1995, 10 (01) :465-475
[4]   DAILY GENERATION SCHEDULING OPTIMIZATION WITH TRANSMISSION CONSTRAINTS - A NEW CLASS OF ALGORITHMS [J].
BATUT, J ;
RENAUD, A .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1992, 7 (03) :982-989
[5]  
BENDERS JF, 1962, NUMER MATH, V4, P238, DOI [10.1007/BF01386316, DOI 10.1007/BF01386316, DOI 10.1007/S10287-004-0020-Y]
[6]  
BROOKE A, 1998, RELEASE 2 50 GAMS US
[7]  
*CIGRE, 1998, 380401 CIGRE
[8]   SHORT-TERM RESOURCE SCHEDULING IN MULTI-AREA HYDROTHERMAL POWER-SYSTEMS [J].
FERREIRA, LAFM ;
ANDERSSON, T ;
IMPARATO, CF ;
MILLER, TE ;
PANG, CK ;
SVOBODA, A ;
VOJDANI, AF .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1989, 11 (03) :200-212
[9]  
*GAMS DEV CORP, 2001, GAMS CPLEX 7 0 US NO
[10]  
Geoffrion A, 1974, MATHEMATICAL PROGRAM, V2, P82, DOI DOI 10.1007/BFB0120690