Audit scheduling with overlapping activities and sequence-dependent setup costs

被引:26
作者
Dodin, B [1 ]
Elimam, AA [1 ]
机构
[1] SAN FRANCISCO STATE UNIV,BUSINESS ANAL & COMP SYST,COLL BUSINESS,SAN FRANCISCO,CA 94132
关键词
audit scheduling; activity network; integer programming; setup time; setup cost; overlapping relationships;
D O I
10.1016/S0377-2217(96)00057-4
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Audit firms are faced with the complex job of scheduling auditors to audit tasks, The scheduling becomes more complex as the firm needs to consider real life issues in determining an optimal schedule. Among these issues are the setup times and costs emanating from changing the assignments of the auditors and the lead and lag relationships between the audit tasks. Audit scheduling with overlapping activities and sequence-dependent setup cost has not been treated in literature. This paper presents a formulation and a solution approach for this audit scheduling problem. First, the problem is represented by an activity network with lead/lag relationships. Then the network is analyzed to determine the early and late finish times of activities. An integer linear program (ILP), which uses the early and late finish times of activities to reduce the number of decision variables, is formulated. A four-auditor two-engagement example is used to illustrate the ILP model and its solution. The results indicate that incorporating the setup cost and the overlapping of activities yields lower cost schedules leading to sizable savings in the cost of audits, The proposed treatment is of merit in providing realistic schedules that can be easily implemented.
引用
收藏
页码:22 / 33
页数:12
相关论文
共 14 条
[1]  
Baker KR., 1974, Introduction to Sequencing and Scheduling
[2]  
BALACHANDRAN BV, 1981, ACCOUNT REV, V56, P801
[3]  
BALACHANDRAN KR, 1982, ACCOUNT REV, V57, P125
[4]  
CHAN KH, 1986, ACCOUNT REV, V61, P726
[5]   APPLICATION OF PRODUCTION SCHEDULING METHODS TO EXTERNAL AND INTERNAL AUDIT SCHEDULING [J].
DODIN, B ;
CHAN, KH .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 52 (03) :267-279
[6]   SCHEDULING OF PROJECT NETWORKS BY JOB ASSIGNMENT [J].
DREXL, A .
MANAGEMENT SCIENCE, 1991, 37 (12) :1590-1602
[7]  
Elmaghraby S.E., 1977, Activity Networks: Project Planning and Control by Network Models
[8]   THE ANALYSIS OF ACTIVITY NETWORKS UNDER GENERALIZED PRECEDENCE RELATIONS (GPRS) [J].
ELMAGHRABY, SE ;
KAMBUROWSKI, J .
MANAGEMENT SCIENCE, 1992, 38 (09) :1245-1263
[9]   AN OPTIMIZATION APPROACH FOR SCHEDULING INTERNAL AUDITS OF DIVISIONS [J].
KNECHEL, WR ;
BENSON, HP .
DECISION SCIENCES, 1991, 22 (02) :391-405
[10]  
Moder J.J., 1983, Project Management with CPM, PERT and Precedence Diagramming