Retirement-Driven Dynamic VAR Planning for Voltage Stability Enhancement of Power Systems With High-Level Wind Power

被引:56
作者
Liu, Junwei [1 ]
Xu, Yan [2 ]
Dong, Zhao Yang [1 ]
Wong, Kit Po [3 ]
机构
[1] Univ New South Wales, Sch Elect Engn & Telecommun, Sydney, NSW 2052, Australia
[2] Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, Singapore
[3] Univ Western Australia, Sch Elect Elect & Comp Engn, Perth, WA 6009, Australia
关键词
Dynamic load; dynamic VAR compensation; equipment retirement planning; STATCOM; wind-penetrated; ALGORITHM;
D O I
10.1109/TPWRS.2017.2732441
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
080906 [电磁信息功能材料与结构]; 082806 [农业信息与电气工程];
摘要
Conventional VAR compensation devices such as capacitor banks and synchronous condensers, after long periods of service, have become aged and less effective to satisfy stringent requirement of short-term voltage stability in high-level wind power penetrated power systems. STATCOMs with a rapid and dynamic reactive power support capability can be an ideal alternative, when combined with a proper equipment retirement and upgrades scheme. This paper proposes a systematic approach for optimal dynamic VAR resource planning and upgrading for a power system with increased wind power penetration and equipment retirement. The problem is constituted by two parts that are aged equipment retirement and new equipment placement. A multiobjective optimization model is proposed to minimize three objectives: the cost of retirement and upgrades, the index of proximity to steady-state voltage collapse, and the index of transient voltage unaccepted performance. To simulate real-world operating situation, multiple contingencies and uncertain dynamic load models are taken into account. Furthermore, low- and high-voltage ride through abilities for wind farms are modeled. The proposed model is tested on the New England 39-bus test system.
引用
收藏
页码:2282 / 2291
页数:10
相关论文
共 33 条
[1]
AEMO, 2014, 2014 VICT ANN PLANN
[2]
AEMO, 2011, EC PLANN CRIT QUEENS
[3]
AEMO, 2016, 2016 NAT TRANSM NETW
[4]
AEMO, 2016, S AUSTR SEP EV 1 DEC
[5]
AEMO, 2016, UPD REP BLACK SYST E
[6]
AEMO, 2012, 2012 VICT ANN PLANN
[7]
[Anonymous], 2007, WIND GENERATION TASK, V13
[8]
[Anonymous], INT J DIGITAL MULTIM
[9]
[Anonymous], 2012, NONLINEAR MULTIOBJEC
[10]
OPTIMAL SIZING OF CAPACITORS PLACED ON A RADIAL-DISTRIBUTION SYSTEM [J].
BARAN, ME ;
WU, FF .
IEEE TRANSACTIONS ON POWER DELIVERY, 1989, 4 (01) :735-743