Decision making of a virtual power plant under uncertainties for bidding in a day-ahead market using point estimate method

被引:207
作者
Peik-Flerfeh, Malahat [1 ]
Seifi, H. [1 ]
Sheikh-El-Eslami, M. K. [1 ]
机构
[1] Tarbiat Modares Univ, Fac Elect & Comp Engn, Tehran, Iran
关键词
Distributed energy resources; Dispatchable load; Point estimate method; Price based unit commitment; Virtual power plant; DISTRIBUTED GENERATION; DISTRIBUTION NETWORKS; DISTRIBUTION-SYSTEM; ANCILLARY SERVICES; WIND POWER; PART II; ENERGY; RESOURCES; OPERATION; STRATEGY;
D O I
10.1016/j.ijepes.2012.07.016
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Environmental concerns, improvements in renewable energy technologies, governmental incentives for the use of these resources, and increased T&D costs, are the main factors driving the energy sector into a new era, where considerable portions of electrical demand will be met through widespread installation of Distributed Energy Resources (DERs). The Virtual Power Plant (VPP) is a decentralized energy management system tasked to aggregate the capacity of some Distributed Generations (DGs), storage facilities, and Dispatchable Loads (DLs) for the purpose of energy trading and/or providing system support services. Due to the stochastic behavior of the prime sources of some DGs, such as wind speed and temperature, the steady state analysis of the systems with integration of such DG units requires a probabilistic approach. In this paper, a probabilistic Price Based Unit Commitment (PBUC) approach using Point Estimate Method (PEM) is employed to model the uncertainty in market price and generation sources, for optimal bidding of a VPP in a day-ahead electricity market. Also, the uncertainty of stochastic DGs generations is handled through increasing the amount of required reserve. The proposed model allows a VPP to decide on the unit commitment of its DERs, and the optimal sale/purchase bids to the day-ahead market. The proposed optimization algorithm is applied to an 18-buses system. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:88 / 98
页数:11
相关论文
共 43 条
[1]   Distributed resources and re-regulated electricity markets [J].
Ackermann, Thomas .
ELECTRIC POWER SYSTEMS RESEARCH, 2007, 77 (09) :1148-1159
[2]  
Albadi MHH, 2010, THESIS U WATERLOO
[3]   Disco Operation Considering DG Units and Their Goodness Factors [J].
Algarni, Ayed A. S. ;
Bhattacharya, Kankar .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2009, 24 (04) :1831-1840
[4]  
[Anonymous], SES6518272
[5]  
[Anonymous], 1997, VIRTUAL UTILITY ACCO
[6]  
[Anonymous], 2002, REP INT EN AG
[7]  
[Anonymous], 2003, REP WORLD ALL DEC EN
[8]   Short-Term Scheduling and Control of Active Distribution Systems With High Penetration of Renewable Resources [J].
Borghetti, Alberto ;
Bosetti, Mauro ;
Grillo, Samuele ;
Massucco, Stefano ;
Nucci, Carlo Alberto ;
Paolone, Mario ;
Silvestro, Federico .
IEEE SYSTEMS JOURNAL, 2010, 4 (03) :313-322
[9]   Wind generation imbalances penalties in day-ahead energy markets: The Italian case [J].
Brunetto, C. ;
Tina, G. .
ELECTRIC POWER SYSTEMS RESEARCH, 2011, 81 (07) :1446-1455
[10]  
Caldon R, 2004, IEEE U POW ENG C UPE, V3, P1058