Social network model of construction

被引:245
作者
Chinowsky, Paul [1 ]
Diekmann, James [1 ]
Galotti, Victor [1 ]
机构
[1] Univ Colorado, Dept Civil Environm & Architectural Engn, Boulder, CO 80309 USA
关键词
D O I
10.1061/(ASCE)0733-9364(2008)134:10(804)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Engineering and construction projects are dependent on two fundamental elements: (1) the ability to plan and manage the technical components of the project such as the tasks and resources; and (2) the ability of the project participants to effectively develop into a high performance team. Historically, the industry has focused extensively on optimizing the project management processes associated with the former element. In this focus, organizations have emphasized the ability to develop the optimum plan, allocate resources efficiently, and utilize control functions to ensure that the project stays on schedule and within budget. Although this has been effective, this engineering focus has reached the point of diminishing results. Specifically, the engineering approach to project management has neglected to recognize the importance of the participants to the success of the overall project. Rather, the engineering approach has favored the development of an optimum plan as the path to effective project management. In this paper, the engineering-based approach to project success is reconfigured to reemphasize the need to develop high performing teams by recognizing the importance of the project network. This recognition is formalized in the social network model of construction that integrates classic project management concepts with social science variables to enhance the focus on knowledge sharing as the foundation for achieving high performance teams and project results.
引用
收藏
页码:804 / 812
页数:9
相关论文
共 31 条
[1]  
Alba R.D., 1982, Research in the Sociology of Organizations, P39
[2]  
Allen T. J., 1977, Managing the Flow of Technology -Technological Transfer and the Dissemination of Technological Information within R
[3]  
ASHLEY D, 1991, J WATER RESOUR PLANN, V117, P321
[4]  
Ashley D. B., 1987, Project Management Journal, V18, P69
[5]  
Bales R.F., 1950, INTERACTION PROCESS
[6]  
Blois K., 1999, MARK INTELL PLAN, V17, P91
[7]   Exploring critical success factors for partnering in construction projects [J].
Chan, APC ;
Chan, DWM ;
Chiang, YH ;
Tang, BS ;
Chan, EHW ;
Ho, KSK .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (02) :188-198
[8]  
CHINOWSKY P, 2007, CIB PUBLICATION, V313, P45
[9]   Knowledge management to learning organization connection [J].
Chinowsky, Paul ;
Carrillo, Patricia .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2007, 23 (03) :122-130
[10]   Critical success factors for different project objectives [J].
Chua, DKH ;
Kog, YC ;
Loh, PK .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (03) :142-150