Analyzing the Impact of Negative Cash Flow on Construction Performance in the Dubai Area

被引:24
作者
Al-Joburi, Khalil I. [1 ]
Al-Aomar, Raid [2 ]
Bahri, Mohammed E. [3 ]
机构
[1] Univ Bahrain, Dept Civil & Architecture Engn, Isa Town, Bahrain
[2] Dhabi Univ, Engn Management Program, Khalifah A City, U Arab Emirates
[3] Zoning Author Dev Control, Dubai, U Arab Emirates
关键词
Negative cash flow; Project life cycle; Construction management; Construction performance; Construction industry;
D O I
10.1061/(ASCE)ME.1943-5479.0000123
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Cash flow impacts all aspects of the construction project implementation process. Cash shortages can lead to project failure and business bankruptcy. Researchers have studied cash flow in the context of scheduling, project delay, business failure, and forecasting. However, negative cash flow trends and patterns themselves have not been closely examined. This paper investigates negative cash flow trends and patterns and their impact on construction performance. To this end, the study reviews financial and scheduling data for 40 ongoing projects in the Dubai area and selects four projects for in-depth analysis. These projects represent the main categories of the Dubai construction industry in terms of type, budget, and business. Three elements of project cash flow are analyzed: (1) actual cash disbursements; (2) cash receipts; and (3) accumulated cash flow. Results of data analysis indicate that there was negative cash flow for 30 to 70% of project duration in each of the selected subject projects. The high shortage values ranged from two to four times the average monthly expenses. The study also investigated how some contractors are able to reduce the extent and amount of negative cash flow on their projects and complete them as scheduled by rescheduling construction activities on the basis of cash flow availability. The study shows that the amount, duration, and distribution of negative cash flow are critical factors in construction performance. Finally, study results underscore the essential need to plan for cash flow in all phases to ensure a successful and profitable project. DOI: 10.1061/(ASCE)ME.1943-5479.0000123. (C) 2012 American Society of Civil Engineers.
引用
收藏
页码:382 / 390
页数:9
相关论文
共 32 条
[1]  
Abdul-Rahman H., 2009, Journal of Retail and Leisure Property, V8, P225, DOI [10.1057/rlp.2009.11, DOI 10.1057/RLP.2009.11]
[2]   Multiobjective Evolutionary Finance-Based Scheduling: Entire Projects' Portfolio [J].
Abido, M. A. ;
Elazouni, Ashraf M. .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2011, 25 (01) :85-97
[3]  
Al-Momani A.H., 2000, INT J PROJ MANAG, V18, P51
[4]   THE SUCCESS OF BUSINESS FAILURE PREDICTION MODELS - AN INTERNATIONAL SURVEY [J].
ALTMAN, EI .
JOURNAL OF BANKING & FINANCE, 1984, 8 (02) :171-198
[5]  
Arditi David, 2010, International Journal of Project Organisation and Management, V2, P61, DOI 10.1504/IJPOM.2010.031882
[6]  
Arditi D., 2000, ENG CONSTR ARCHIT MA, V7, P120, DOI [DOI 10.1108/EB021137, 10.1108/eb021137]
[7]  
Argenti J., 1976, Corporate collapse: The causes and symptoms
[8]   CAUSES OF DELAY IN LARGE BUILDING CONSTRUCTION PROJECTS [J].
ASSAF, SA ;
ALKHALIL, M ;
ALHAZMI, M .
JOURNAL OF MANAGEMENT IN ENGINEERING, 1995, 11 (02) :45-50
[9]  
Chen M., 2007, AACE INT T, VWV, pPM21
[10]  
Cooke B., 1986, COST FINANCIAL CONTR, p[25, 41]