An integrated data collection and analysis framework for remote monitoring and planning of construction operations

被引:55
作者
Akhavian, Reza [1 ]
Behzadan, Amir H. [1 ]
机构
[1] Univ Cent Florida, Dept Civil Environm & Construct Engn, Orlando, FL 32816 USA
关键词
Construction; Simulation; Visualization; Data collection; Decision support; Control; SIMULATION; TRACKING; DELIVERY; LOCATION; SYSTEMS;
D O I
10.1016/j.aei.2012.04.004
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Recent advances in data collection and operations analysis techniques have facilitated the process of designing, analyzing, planning, and controlling of engineering processes. Mathematical tools such as graphical models, scheduling techniques, operations research, and simulation have enabled engineers to create models that represent activities, resources, and the environment under which a project is taking place. Traditionally, most simulation paradigms use static or historical data to create computer interpretable representations of real engineering systems. The suitability of this approach for modeling construction operations, however, has always been a challenge since most construction projects are unique in nature as every project is different in design, specifications, methods, and standards. Due to the dynamic nature and complexity of most construction operations, there is a significant need for a methodology that combines the capabilities of traditional modeling of engineering systems and real time field data collection. This paper presents the requirements and applicability of a data-driven modeling framework capable of collecting and manipulating real time field data from construction equipment, creating dynamic 3D visualizations of ongoing engineering activities, and updating the contents of a discrete event simulation model representing the real engineering system. The developed framework can be adopted for use by project decision-makers for short-term project planning and control since the resulting simulation and visualization are completely based on the latest status of project entities. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:749 / 761
页数:13
相关论文
共 61 条
[1]   COMPUTER-SIMULATION - TUTORIAL [J].
ADKINS, G ;
POOCH, UW .
COMPUTER, 1977, 10 (04) :12-17
[2]  
Akhavian R., 2011, 2011 ASCE CONSTR RES
[3]  
Akhavian R., 2011, 18 WORKSH INT COMP E
[4]  
Ang A, 2007, PROBABILITY CONCEPTS
[5]  
[Anonymous], 1998, HDB SIMULATION PRINC
[6]   Ubiquitous location tracking for context-specific information delivery on construction sites [J].
Behzadan, Amir H. ;
Aziz, Zeeshan ;
Anumba, Chimay J. ;
Kamat, Vineet R. .
AUTOMATION IN CONSTRUCTION, 2008, 17 (06) :737-748
[7]  
Behzadan AH, 2007, PROCEEDINGS OF THE 2007 WINTER SIMULATION CONFERENCE, VOLS 1-5, P2147
[8]   Automated Generation of Operations Level Construction Animations in Outdoor Augmented Reality [J].
Behzadan, Amir H. ;
Kamat, Vineet R. .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2009, 23 (06) :405-417
[9]  
Behzadan AmirH., 2009, CONSTRUCTION RES C 2, P1214, DOI DOI 10.1061/41020(339)123
[10]   Automated vision tracking of project related entities [J].
Brilakis, Ioannis ;
Park, Man-Woo ;
Jog, Gauri .
ADVANCED ENGINEERING INFORMATICS, 2011, 25 (04) :713-724