Modeling and analysis of congestion in the design of facility layouts

被引:70
作者
Benjaafar, S [1 ]
机构
[1] Univ Minnesota, Dept Mech Engn, Div Ind Engn, Minneapolis, MN 55455 USA
关键词
facility layout; queueing networks; quadratic assignment problem; material handling; performance evaluation;
D O I
10.1287/mnsc.48.5.679.7800
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Reducing manufacturing lead times and minimizing work-in-process (WIP) inventories are the cornerstones of popular manufacturing strategies such as Lean, Quick Response, and Just-in-Time Manufacturing. In this paper, we present a model that captures the relationship between facility layout and congestion-related measures of performance. We use the model to introduce a formulation of the facility layout design problem where the objective is to minimize work-in-process (WIP). In contrast to some recent research, we show that layouts obtained using a WIP-based formulation can be very different from those obtained using the conventional quadratic assignment problem (QAP) formulation. For example, we show that a QAP-optimal layout can be WIP-infeasible. Similarly, we show that two QAP-optimal layouts can have vastly different WIP values. In general, we show that WIP is not monotonic in material-handling travel distances. This leads to a number of surprising results. For instance, we show that it is possible to reduce overall distances between departments but increase WIP. Furthermore, we find that the relative desirability of a layout can be affected by changes in material-handling capacity even when travel distances remain the same. We examine the effect of various system parameters on the difference in WIP between QAP- and WIP-optimal layouts. We find that although there are conditions under which the difference in WIP is significant, there are those under which both layouts are WIP-equivalent.
引用
收藏
页码:679 / 704
页数:26
相关论文
共 28 条
[1]  
BENJAAFAR S, 2002, IN PRESS INTERFACES
[2]  
Bitran G. R., 1992, Queueing Systems Theory and Applications, V12, P95, DOI 10.1007/BF01158637
[3]   APPROXIMATIONS FOR PRODUCT DEPARTURES FROM A SINGLE-SERVER STATION WITH BATCH PROCESSING IN MULTI-PRODUCT QUEUES [J].
BITRAN, GR ;
TIRUPATI, D .
MANAGEMENT SCIENCE, 1989, 35 (07) :851-878
[4]  
Buzacott J.A., 1993, STOCHASTIC MODELS MA
[5]  
EGEBELU PJ, 1987, MAT FLOW, V4, P17
[6]   Minimizing work-in-process and material handling in the facilities layout problem [J].
Fu, MC ;
Kaku, BK .
IIE TRANSACTIONS, 1997, 29 (01) :29-36
[7]  
FU MC, 1997, QUEUEING NETWORK MOD
[8]  
GREEN J, 2000, BUSINESS WEEK 1002
[9]   The effects of trailer scheduling on the layout of freight terminals [J].
Gue, KR .
TRANSPORTATION SCIENCE, 1999, 33 (04) :419-428
[10]  
HOPP WJ, 2000, FACTORY PHYSICS