Framework for competency and capability assessment for resource allocation

被引:21
作者
Trejo, D
Patil, S
Anderson, S
Cervantes, E
机构
[1] Texas A&M Univ, Dept Civil Engn, College Stn, TX 77843 USA
[2] Independent Project Anal Inc, Project Anal, Reston, VA 20190 USA
[3] Princeton Univ, Operat Res & Financial Engn Dept, Princeton, NJ 08544 USA
关键词
resource allocation; personnel management; professional personnel;
D O I
10.1061/(ASCE)0742-597X(2002)18:1(44)
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper proposes a decision process that engineering organizations can use to make human resource allocation decisions. This type of systematic approach will assist organizations in determining accurate predictions of their strengths and weaknesses and enable them to determine optimum resource allocations. In addition, identifying strategic core competencies followed by identification of organizational and individual capabilities necessary to fulfill the needs of these core competencies will optimize human resource allocations. The proposed framework can complement and improve on available methods for identifying sourcing strategies with a goal of "rightsizing" organizations. Assessment of organizational competencies and capabilities can provide the necessary rationale behind human resource allocation and outsourcing decisions. Using the proposed framework presented in this paper would, therefore, assist companies in optimizing human resource allocation decisions.
引用
收藏
页码:44 / 49
页数:6
相关论文
共 10 条
[1]  
AbouRizk S. M., 1995, Microcomputers in Civil Engineering, V10, P111
[2]   Optimizing owner/contractor core competencies for capital programs [J].
Anderson, SD ;
Patil, SS ;
Sullivan, G .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2001, 17 (02) :77-85
[3]  
Bettis R.A., 1992, ACADEMY MANAGEMENT E, V6, P7, DOI DOI 10.5465/AME.1992.4274298
[4]  
*CII, 1997, OWN CONTR WORK STRUC
[5]  
Construction Industry Institute (CII), 1994, PREPR PLANN BEG PROJ
[6]  
GALLON MR, 1995, RES TECHNOL MANAGE, V38, P20
[7]   EVALUATING PREQUALIFICATION CRITERIA IN CONTRACTOR SELECTION [J].
HOLT, GD ;
OLOMOLAIYE, PO ;
HARRIS, FC .
BUILDING AND ENVIRONMENT, 1994, 29 (04) :437-448
[8]  
*NACE, 1995, JOB OULT 96
[9]  
QUINN JB, 1994, SLOAN MANAGE REV, V35, P43
[10]  
Russell J. S., 1990, Microcomputers in Civil Engineering, V5, P285