共 13 条
[1]
Scheduling cost optimization and neural dynamics model for construction
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1997, 123 (04)
:450-458
[2]
Adeli H., 1999, DISTRIBUTED COMPUTER
[3]
Adeli H., 1998, Neurocomputing in Design Automation
[4]
ADELI H, 1990, KNOWLEDGE ENG, V2
[5]
ADELI H, 1990, KNOWLEDGE ENG, V1
[6]
Adeli H., 1995, MACHINE LEARNING NEU
[7]
BARBERO JI, 1998, ISATA MAGAZINE DEC, P26
[8]
El-Bibany H. E., 1999, Computer-Aided Civil and Infrastructure Engineering, V14, P1, DOI 10.1111/0885-9507.00125
[9]
Kaneta T., 1999, Computer-Aided Civil and Infrastructure Engineering, V14, P45, DOI 10.1111/0885-9507.00129
[10]
Pena-Mora F., 1999, Computer-Aided Civil and Infrastructure Engineering, V14, P171, DOI 10.1111/0885-9507.00139