Considering uncertainty in the optimal energy management of renewable micro-grids including storage devices

被引:209
作者
Baziar, Aliasghar [1 ]
Kavousi-Fard, Abdollah [1 ]
机构
[1] Islamic Azad Univ, Sarvestan Branch, Dept Elect Engn, Sarvestan, Iran
关键词
Uncertainty; Two point estimate method (PEM); Self adaptive modified theta-particle swarm optimization (SAM-theta-PSO); Renewable micro-grid; Storage device; DISTRIBUTION FEEDER RECONFIGURATION; OPERATION MANAGEMENT; POWER; SYSTEM; HYDROGEN;
D O I
10.1016/j.renene.2013.03.026
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper proposes a new probabilistic framework based on 2m Point Estimate Method (2m PEM) to consider the uncertainties in the optimal energy management of the Micro Girds (MGs) including different renewable power sources like Photovoltaics (PVs), Wind Turbine (WT), Micro Turbine (MT), Fuel Cell (FC) as well as storage devices. The proposed probabilistic framework requires 2m runs of the deterministic framework to consider the uncertainty of m uncertain variables in the terms of the first three moments of the relevant probability density functions. Therefore, the uncertainty regarding the load demand forecasting error, grid bid changes and WT and PV output power variations are considered concurrently. Investigating the MG problem with uncertainty in a 24 h time interval with several equality and inequality constraints requires a powerful optimization technique which could escape from the local optima as well as premature convergence. Consequently, a novel self adaptive optimization algorithm based on theta-Particle Swarm Optimization (theta-PSO) algorithm is proposed to explore the total search space globally. The theta-PSO algorithm uses the phase angle vectors to update the velocity/position of particles such that faster and more stable convergence is achieved. In addition, the proposed self adaptive modification method consists of three sub-modification methods which will let the particles choosel the modification method which best fits their current situation. The feasibility and satisfying performance of the proposed method is tested on a typical grid-connected MG as the case study. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:158 / 166
页数:9
相关论文
共 25 条
[1]  
[Anonymous], 1981, RISK ANAL, DOI DOI 10.1111/J.1539-6924.1981.TB01415.X
[2]   Distributed intelligent energy management system for a single-phase high-frequency AC microgrid [J].
Chakraborty, Sudipta ;
Weiss, Manoja D. ;
Simoes, M. Godoy .
IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, 2007, 54 (01) :97-109
[3]   Unit sizing and control of hybrid wind-solar power systems [J].
Chedid, R ;
Rahman, S .
IEEE TRANSACTIONS ON ENERGY CONVERSION, 1997, 12 (01) :79-85
[4]   Smart energy management system for optimal microgrid economic operation [J].
Chen, C. ;
Duan, S. ;
Cai, T. ;
Liu, B. ;
Hu, G. .
IET RENEWABLE POWER GENERATION, 2011, 5 (03) :258-267
[5]   Optimal participation and risk mitigation of wind generators in an electricity market [J].
Dukpa, A. ;
Duggal, I. ;
Venkatesh, B. ;
Chang, L. .
IET RENEWABLE POWER GENERATION, 2010, 4 (02) :165-175
[6]   Optimal planning and design of a renewable energy based supply system for microgrids [J].
Hafez, Omar ;
Bhattacharya, Kankar .
RENEWABLE ENERGY, 2012, 45 :7-15
[7]  
Hahn G.J., 1967, Statistical Models in Engineering
[8]   Reliability enhancement using optimal distribution feeder reconfiguration [J].
Kavousi-Fard, Abdollah ;
Akbari-Zadeh, Mohammad-Reza .
NEUROCOMPUTING, 2013, 106 :1-11
[9]   Consideration effect of uncertainty in power system reliability indices using radial basis function network and fuzzy logic theory [J].
Kavousifard, Abdollah ;
Samet, Haidar .
NEUROCOMPUTING, 2011, 74 (17) :3420-3427
[10]   Intelligent renewable microgrid scheduling controlled by a virtual power producer: A laboratory experience [J].
Khodr, H. M. ;
El Halabi, N. ;
Garcia-Gracia, M. .
RENEWABLE ENERGY, 2012, 48 :269-275