Comparisons of grey and neural network prediction of industrial park wastewater effluent using influent quality and online monitoring parameters

被引:18
作者
Pai, T. Y. [1 ]
Chuang, S. H. [1 ]
Wan, T. J. [2 ]
Lo, H. M. [1 ]
Tsai, Y. P. [3 ]
Su, H. C. [1 ]
Yu, L. F. [1 ]
Hu, H. C. [1 ]
Sung, P. J. [1 ]
机构
[1] Chaoyang Univ Technol, Dept Environm Engn & Management, Taichung 41349, Taiwan
[2] Natl Yunlin Univ Sci & Technol, Dept Environm & Safety Engn, Touliu 64002, Yunlin, Taiwan
[3] Natl Chi Nan Univ, Dept Civil Engn, Puli 545, Nantou, Taiwan
关键词
Grey model; Artificial neural network; Wastewater treatment plant; Conventional activated sludge process; Industrial park;
D O I
10.1007/s10661-007-0059-7
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In this study, Grey model (GM) and artificial neural network (ANN) were employed to predict suspended solids (SSeff) and chemical oxygen demand (CODeff) in the effluent from a wastewater treatment plant in industrial park of Taiwan. When constructing model or predicting, the influent quality or online monitoring parameters were adopted as the input variables. ANN was also adopted for comparison. The results indicated that the minimum MAPEs of 16.13 and 9.85% for SSeff and CODeff could be achieved using GMs when online monitoring parameters were taken as the input variables. Although a good fitness could be achieved using ANN, they required a large quantity of data. Contrarily, GM only required a small amount of data (at least four data) and the prediction results were even better than those of ANN. Therefore, GM could be applied successfully in predicting effluent when the information was not sufficient. The results also indicated that these simple online monitoring parameters could be applied on prediction of effluent quality well.
引用
收藏
页码:51 / 66
页数:16
相关论文
共 16 条
[1]  
APHA AWWA WEF, 1995, STAND METH EX WAT WA
[2]   A grey fuzzy multiobjective programming approach for the optimal planning of a reservoir watershed .A. Theoretical development [J].
Chang, NB ;
Wen, CG ;
Chen, YL ;
Yong, YC .
WATER RESEARCH, 1996, 30 (10) :2329-2334
[3]   A GREY NONLINEAR-PROGRAMMING APPROACH FOR PLANNING COASTAL WASTE-WATER TREATMENT FIND DISPOSAL SYSTEMS [J].
CHANG, NB ;
WANG, SF .
WATER SCIENCE AND TECHNOLOGY, 1995, 32 (02) :19-29
[4]   A grey fuzzy multiobjective programming approach for the optimal planning of a reservoir watershed .B. Application [J].
Chang, NB ;
Wen, CG ;
Chen, YL ;
Yong, YC .
WATER RESEARCH, 1996, 30 (10) :2335-2340
[5]   DYNAMIC MODELING OF THE ACTIVATED-SLUDGE PROCESS - IMPROVING PREDICTION USING NEURAL NETWORKS [J].
COTE, M ;
GRANDJEAN, BPA ;
LESSARD, P ;
THIBAULT, J .
WATER RESEARCH, 1995, 29 (04) :995-1004
[6]  
Deng Julong, 1989, Journal of Grey Systems, V1, P1
[7]   Simulation of an industrial wastewater treatment plant using artificial neural networks [J].
Gontarski, CA ;
Rodrigues, PR ;
Mori, M ;
Prenem, LF .
COMPUTERS & CHEMICAL ENGINEERING, 2000, 24 (2-7) :1719-1723
[8]   Feasibility of on-line measurement of sewage components using the UV absorbance and the neural network [J].
Jeong, Hyeong-Seok ;
Lee, Sang-Hyung ;
Shin, Hang-Sik .
ENVIRONMENTAL MONITORING AND ASSESSMENT, 2007, 133 (1-3) :15-24
[9]   Grey and neural network prediction of suspended solids and chemical oxygen demand in hospital wastewater treatment plant effluent [J].
Pai, T. Y. ;
Tsai, Y. P. ;
Lo, H. M. ;
Tsai, C. H. ;
Lin, C. Y. .
COMPUTERS & CHEMICAL ENGINEERING, 2007, 31 (10) :1272-1281
[10]   Microbial kinetic analysis of three different types of EBNR process [J].
Pai, TY ;
Tsai, YP ;
Chou, YJ ;
Chang, HY ;
Leu, HG ;
Ouyang, CF .
CHEMOSPHERE, 2004, 55 (01) :109-118