An object-oriented constraints-based system for concurrent product development

被引:20
作者
Gayretli, A [1 ]
Abdalla, HS [1 ]
机构
[1] De Montfort Univ, Fac Comp Sci & Engn, Dept Mech & Mfg Engn, Leicester LE1 9BH, Leics, England
关键词
feature-based design; object-oriented programming; concurrent engineering; process optimisation; cost estimation; constraints; knowledge-based systems;
D O I
10.1016/S0736-5845(99)00007-1
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This research work aims to develop an intelligent constraint-based system that enables designers to consider at the early stages of the design process all activities associated with product's life cycle. One of the most important aspects of these activities is the evaluation and optimisation of manufacturing processes that require various type of information from the different aspects of product's life cycle. This research article discusses the development of a prototype system for manufacturing process optimisation using a combination of both mathematical methods and constraint-programming techniques. This approach enables designers to evaluate and optimise feasible manufacturing professes in a consistent manner as early as possible during the design process. This helps in avoiding unexpected design iterations that wastage a great amount of time and effort, leading to longer lead-time. The development process has passed through the five major stages: Firstly, an intelligent constraint-based design system for concurrent product and process design has been developed. Secondly, a manufacturing process optimisation module has been constructed. Thirdly, the product features, processes, cost, time and constraints to be used for carrying out various design tasks has been represented in the format of constraints, frames, objects, and rules. Fourthly, the process optimisation and evaluation rules for the selection of feasible processes for complex features, and finally, the information management system that ensures consistency in information exchange and decision making activities have been developed. (C) 1999 Published by Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:133 / 144
页数:12
相关论文
共 25 条
[1]   AN EXPERT-SYSTEM FOR CONCURRENT PRODUCT AND PROCESS DESIGN OF MECHANICAL PARTS [J].
ABDALLA, HS ;
KNIGHT, J .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 1994, 208 (03) :167-172
[2]  
[Anonymous], 1985, INTRO AUTOMATED PROC
[3]  
Balashov YA, 1996, PETROLOGY, V4, P1
[4]  
Chang T-C, 1990, Expert process planning for manufacturing
[5]  
DAS D, 1994, COMPUT ENG, V1, P159
[6]  
DAS D, 1995, P COMP ENG C ENG DAT, P619
[7]   EARLY COST ESTIMATING IN PRODUCT DESIGN [J].
DEWHURST, P ;
BOOTHROYD, G .
JOURNAL OF MANUFACTURING SYSTEMS, 1988, 7 (03) :183-191
[8]  
Downlatshahi S, 1997, CONCURRENT ENG-RES A, V5, P145
[9]  
Fen C.J, 1996, COMPUT AIDED DESIGN, V28, P879
[10]  
GAYRETLI A, 1998, P TMCE 98 APR