Developing scheduling systems for Daewoo Shipbuilding: DAS project

被引:76
作者
Lee, JK [1 ]
Lee, KJ [1 ]
Park, HK [1 ]
Hong, JS [1 ]
Lee, JS [1 ]
机构
[1] SANG MYUNG UNIV,DEPT INFORMAT SCI,CHONGRO KU,SEOUL 110743,SOUTH KOREA
关键词
scheduling; manufacturing industries; artificial intelligence; shipbuilding;
D O I
10.1016/S0377-2217(96)00205-6
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Daewoo Shipbuilding Company, one of the largest shipbuilders in the world, had difficulties with planning and scheduling its production process. To solve the problems, Korea Advanced Institute of Science and Technology (KAIST) and Daewoo have been jointly performing the DAS (DAewoo Shipbuilding Scheduling) Project for three years, from 1991 to 1993. To develop the integrated scheduling systems, several technological breakthroughs were necessary such as hierarchical architecture between systems, constraint directed graph search, spatial scheduling, dynamic assembly line scheduling, and neural network based man-hours estimation. Besides these technological research issues, we adopted the phased development strategy, which consists of three phases of vision revelation, data dependent realization, and prospective: enhancement. The DAS systems were successfully launched in January 1994 and are being actively used as indispensable systems in the shipyard resulting in a significant improvement in productivity and reengineering of the scheduling process.
引用
收藏
页码:380 / 395
页数:16
相关论文
共 26 条
[2]  
BURNS RN, 1985, DATA BASE FAL, P19
[3]  
HONG JS, 1993, P KOR EXP SYST SOC C, P147
[4]  
KYU LEE JAE, 1995, MANAGEMENT SCI, V41
[5]  
Lee JK, 1995, AI MAG, V16, P78
[6]   CONTINGENCIES FOR THE DESIGN OF SCHEDULING EXPERT SYSTEMS [J].
LEE, JK ;
SUH, MS ;
FOX, MS .
EXPERT SYSTEMS WITH APPLICATIONS, 1993, 6 (03) :219-230
[7]  
LEE JK, 1994, UNIK USES MANUAL
[8]  
LEE JK, 1994, P 94 JAP KOR JOINT C, P203
[9]  
LEE JK, 1994, INTELLIGENT SYSTEMS, V3, P111
[10]  
LEE JK, 1993, P 93 PAN PAC C INF S, P255