共 11 条
[1]
Baker A.D., 1996, Metaphor or Reality: A Case Study Where Agents Bid with Actual Costs to Schedule a Factory, P184
[2]
BAKER AD, J MANUFACTURING SYST, V17, P297
[3]
BROOKS RA, 1986, IEEE J ROBUST AUTOMA, V2
[4]
Goldratt E.M., 1990, THEORY CONSTRAINTS
[5]
GREENE TJ, 1987, PRODUCTION INVENTORY
[7]
PARUNAK HVD, 1365, INTELLIGENT AGENTS 4, P45
[8]
PARUNAK HVD, 1997, P 1 INT C AUT AG ICA
[9]
PARUNAK HVD, UNPUB INTERGRATED CO
[10]
RING J, 1999, CURRENT ENTERPRISE M