Bargaining Games for Material Procurement in Large-scale Projects

被引:1
作者
Fan Dong [1 ]
Xiao Tiao-jun [1 ]
Yang Dan-qin [1 ]
机构
[1] Nanjing Univ, Sch Management Sci & Engn, Nanjing 210093, Peoples R China
来源
2008 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (15TH), VOLS I AND II, CONFERENCE PROCEEDINGS | 2008年
关键词
large-scale project; procurement management; bargaining; COALITION;
D O I
10.1109/ICMSE.2008.4668926
中图分类号
F [经济];
学科分类号
02 ;
摘要
Procurement management is an important process in large-scale projects because large-scale projects heavily depend on building materials from suppliers. This paper applies the basic idea of cooperative game theory and bargaining theory to analyze the cooperation in the procurement of the large-scale projects. We develop two bargaining games of the material procurement between one contractor and one supplier, where they form a procurement coalition. In addition, we give the allocation rule of cooperative surplus for the procurement coalition according to the bargaining theory, i.e., Subgame Perfect Nash Equilibrium solutions. The allocation plan is acceptable for the two players, very stable, and plays an important role in maintaining the survival of the procurement coalition. But the relative bargaining power of the players will determine who benefits more from cooperation.
引用
收藏
页码:265 / 270
页数:6
相关论文
共 21 条
[1]   THE NASH BARGAINING SOLUTION IN ECONOMIC MODELING [J].
BINMORE, K ;
RUBINSTEIN, A ;
WOLINSKY, A .
RAND JOURNAL OF ECONOMICS, 1986, 17 (02) :176-188
[2]  
Cheung S.O., 2003, INT J PROJ MANAG, V21, P333, DOI DOI 10.1016/S0263-7863(02)00052-2
[3]  
Dubois A., 2000, EUROPEAN J PURCHASIN, V6, P207, DOI DOI 10.1016/S0969-7012(00)00016-2
[4]  
ERTOGRAL KSD, 2001, BARGAINING GAME SUPP
[5]  
MUTHOO A, 1999, BARGAINING THEORY AP, P1
[6]   TWO-PERSON COOPERATIVE GAMES [J].
Nash, John .
ECONOMETRICA, 1953, 21 (01) :128-140
[7]   THE BARGAINING PROBLEM [J].
Nash, John F., Jr. .
ECONOMETRICA, 1950, 18 (02) :155-162
[8]   Effect of delivery systems on collaborative negotiations for large-scale infrastructure projects [J].
Peña-Mora, F ;
Tamaki, T .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2001, 17 (02) :105-121
[9]   Computer-supported collaborative negotiation methodology [J].
Pena-Mora, F ;
Wang, CY .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1998, 12 (02) :64-81
[10]   The delivery and control of quality in supplier producer contracts [J].
Reyniers, DJ ;
Tapiero, CS .
MANAGEMENT SCIENCE, 1995, 41 (10) :1581-1589