Operational Slack and Venture Survival

被引:85
作者
Azadegan, Arash [1 ]
Patel, Pankaj C. [2 ]
Panda, Vinit [3 ]
机构
[1] Rutgers Business Sch, Supply Chain Management & Mkt Sci Dept, Newark, NJ 07102 USA
[2] Ball State Univ, Miller Coll Business, Muncie, IN 47306 USA
[3] Lulea Univ Technol, Div Entreprenuership, S-97187 Lulea, Sweden
关键词
operational slack; uncertainty; venture survival; gamma frailty Weibull regression; SUPPLY CHAIN DISRUPTIONS; ORGANIZATIONAL SLACK; FIRM PERFORMANCE; RESOURCES; RISK; UNCERTAINTY; ENVIRONMENT; IMPACT; MARKET; FLEXIBILITY;
D O I
10.1111/j.1937-5956.2012.01361.x
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Slack can act as a double-edged sword. While it can buffer against environmental threats to help ensure business continuity, slack can also be costly and reduce profitability. In this study we focus on operational slack, the form related to the firm's production processes. We investigate the role of operational slack on firm survival during its venture stage when its survival is significantly challenged by environmental threats. Specifically, we explore how change in three types of environmental uncertainty, namely dynamism, complexity, and lack of munificence, affect the relationship between operational slack and venture survival. Results suggest that with an increase in environmental uncertainty, operational slack lowers the likelihood of venture failure.
引用
收藏
页码:1 / 18
页数:18
相关论文
共 91 条
[1]   Perspectives on the productivity dilemma [J].
Adler, Paul S. ;
Benner, Mary ;
Brunner, David James ;
MacDuffie, John Paul ;
Osono, Emi ;
Staats, Bradley R. ;
Takeuchi, Hirotaka ;
Tushman, Michael L. ;
Winter, Sidney G. .
JOURNAL OF OPERATIONS MANAGEMENT, 2009, 27 (02) :99-113
[2]   Decreasing airline delay propagation by re-allocating scheduled slack [J].
Ahmadbeygi, Shervin ;
Cohn, Amy ;
Lapp, Marcial .
IIE TRANSACTIONS, 2010, 42 (07) :478-489
[3]  
Anand G, 2004, PROD OPER MANAG, V13, P369, DOI 10.1111/j.1937-5956.2004.tb00224.x
[4]  
[Anonymous], 1993, An introduction to the bootstrap
[5]  
[Anonymous], 1986, GOAL PROCESS ONGOING
[6]  
[Anonymous], APPL MULTIPLE REGRES
[7]   DIVERSIFICATION UNDER SUPPLY UNCERTAINTY [J].
ANUPINDI, R ;
AKELLA, R .
MANAGEMENT SCIENCE, 1993, 39 (08) :944-963
[8]  
Arthurs JD, 2008, ACAD MANAGE J, V51, P277
[9]   Impact of scheduling free goods on the throughput performance of a manufacturing operation [J].
Atwater, JB ;
Stephens, AA ;
Chakravorty, SS .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (23) :4849-4869
[10]  
Atwater JB, 2002, PROD OPER MANAG, V11, P259, DOI 10.1111/j.1937-5956.2002.tb00495.x