New Multiobjective Optimization Approach to Rehabilitate and Maintain Sewer Networks Based on Whole Lifecycle Behavior

被引:14
作者
Altarabsheh, Ahmad [1 ]
Kandil, Amr [2 ]
Ventresca, Mario [3 ]
机构
[1] Yarmouk Univ, Sch Civil Engn, Dept Construct Engn & Management, Shafiq Irshidat St, Irbid 21163, Jordan
[2] Purdue Univ, Lyles Sch Civil Engn, Dept Construct Engn & Management, 550 W Stadium Ave, W Lafayette, IN 47907 USA
[3] Purdue Univ, Sch Ind Engn, 315 N Grant St, W Lafayette, IN 47907 USA
关键词
PRIORITIZATION; DETERIORATION; MANAGEMENT; ALGORITHM; FAILURE; MODEL;
D O I
10.1061/(ASCE)CP.1943-5487.0000715
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This study proposes a new methodology for selecting renewal plans for sewer networks based on their impacts on the behavior of the networks over their whole lifecycle. The proposed approach combines a multiobjective genetic algorithm and Monte Carlo simulation to maximize network condition and serviceability while minimizing network risk of failure and total lifecycle cost for the entire planning period. The algorithm was applied to a sewer network in Sahab City, Jordan, in 16 different analysis scenarios that consider the uncertainty in the model variables. These different analysis scenarios varied the network age, deterioration rate, and available budget at each time step throughout the planning period. The model was then validated by statistically comparing its performance to an existing prioritization model that does not consider the long-term impact behavior of the wastewater system. The results show that the proposed algorithm outperforms the existing prioritization model because it results in statistically significant improvement in the network condition, risk of failure, serviceability, and the total lifecycle cost at the end of the planning period. (c) 2017 American Society of Civil Engineers.
引用
收藏
页数:20
相关论文
共 34 条
[1]  
Affenzeller M, 2009, NUMER INSIGHT, pXXV
[2]  
AL-Battaineh H. T., 2005, OPTIMIZATION, V2
[3]  
Altarabsheh A.G., 2016, THESIS
[4]  
[Anonymous], 2007, EVOLUTIONARY ALGORIT
[5]  
[Anonymous], 2006, INT J COMPUT INTELL, DOI DOI 10.5019/J.IJCIR.2006.67
[6]  
[Anonymous], 2010, InfoNet
[7]  
[Anonymous], 2001, J INFRASTRUCTURE SYS
[8]   The holistic prioritisation of proactive sewer maintenance [J].
Arthur, S. ;
Crow, H. ;
Pedezert, L. ;
Karikas, N. .
WATER SCIENCE AND TECHNOLOGY, 2009, 59 (07) :1385-1396
[9]  
Ashley R.M., 2004, SOLIDS SEWERS CHARAC
[10]  
Azevedo CRB, 2011, IEEE C EVOL COMPUTAT, P2743