Project of the GT-MHR high-temperature helium reactor with gas turbine

被引:75
作者
Kiryushin, AI [1 ]
Kodochigov, NG [1 ]
Kouzavkov, NG [1 ]
PonomarevStepnoi, NN [1 ]
Gloushkov, ES [1 ]
Grebennik, VN [1 ]
机构
[1] RUSSIAN RES CTR KURCHATOV INST,MOSCOW 123182,RUSSIA
关键词
D O I
10.1016/S0029-5493(97)00099-X
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
In February 1995, MINATOM of Russia and General Atomics (USA) signed the Agreement for the development and design of the GT-MHR facility with a modular helium reactor and a gas turbine intended to be constructed in Russia. This Agreement was subsequently expanded by the participation of Framatom and Fuji Electric. The GT-MHR facility is designed for burning weapons-grade plutonium and utilization of the heat produced in the direct gas-turbine cycle with electricity production efficiency of about 50%. In future such facilities with uranium fuel will be proposed for use as commercial NPPs. A GT-MHR prototype and fuel production facility are intended to be constructed at the Siberian Chemical Combine in Seversk (Tomsk-7). In accordance with the Agreement, a conceptual design of the GT-MHR should be developed in September 1997. As a part of the conceptual design, a reactor module with a power conversion system is being designed and plutonium fuel is being developed. (C) 1997 Elsevier Science S.A.
引用
收藏
页码:119 / 129
页数:11
相关论文
empty
未找到相关数据