A computational study of constraint satisfaction for multiple capacitated job shop scheduling

被引:65
作者
Nuijten, WPM
Aarts, EHL
机构
[1] EINDHOVEN UNIV TECHNOL,DEPT MATH & COMP SCI,5600 MB EINDHOVEN,NETHERLANDS
[2] PHILIPS RES LABS,5600 JA EINDHOVEN,NETHERLANDS
关键词
scheduling; job shop; constraint satisfaction;
D O I
10.1016/0377-2217(95)00354-1
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We introduce the multiple capacitated job shop scheduling problem as a generalization of the job shop scheduling problem. In this problem machines may process several operations simultaneously. We present an algorithm based on constraint satisfaction techniques to handle the problem effectively. The most important novel feature of our algorithm is the consistency checking. An empirical performance analysis is performed using a well-known set of instances of the job shop scheduling problem and a newly constructed set of instances of the multiple capacitated job shop scheduling problem. We show that our algorithm performs well for both sets of instances.
引用
收藏
页码:269 / 284
页数:16
相关论文
共 21 条
[1]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
[2]  
BAPTISTE P, 1995, P 14 INT JOINT C ART
[3]  
BECK H, 1992, AAAI SPR S PRACT APP
[4]  
Carlier J., 1990, Annals of Operations Research, V26, P269
[5]  
Erschler J., 1991, Revue d'Intelligence Artificielle, V5, P7
[6]  
FISHER H, 1963, IND SCHEDULING
[7]  
French S., 1982, Sequencing and Scheduling
[8]  
Garey M. R., 1976, Mathematics of Operations Research, V1, P117, DOI 10.1287/moor.1.2.117
[9]   INCREASING TREE-SEARCH EFFICIENCY FOR CONSTRAINT SATISFACTION PROBLEMS [J].
HARALICK, RM ;
ELLIOTT, GL .
ARTIFICIAL INTELLIGENCE, 1980, 14 (03) :263-313
[10]  
Lawrence S., 1984, Supplement to Resource Constrained Project Scheduling: An Experimental Investigation of Heuristic Scheduling Techniques