The significance of reducing setup times/setup costs

被引:178
作者
Allahverdi, Ali [1 ]
Soroush, H. M. [2 ]
机构
[1] Kuwait Univ, Dept Ind & Management Syst Engn, Safat, Kuwait
[2] Kuwait Univ, Dept Stat & Operat Res, Safat, Kuwait
关键词
scheduling; setup time; setup cost;
D O I
10.1016/j.ejor.2006.09.010
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Scheduling with setup times or setup costs plays a crucial role in todays modern manufacturing and service environments where reliable products/services are to be delivered on time. Scheduling activities profoundly depend on the times/costs required to prepare the facility for performing the activities. However, the vast majority of existing scheduling literature ignores this fact. We define and emphasize the importance, applications, and benefits of explicitly considering setup times/costs in scheduling research. Moreover, a review of the latest research on scheduling problems with setup times/costs is provided. (C) 2006 Elsevier B.V. All rights reserved.
引用
收藏
页码:978 / 984
页数:7
相关论文
共 42 条
[1]  
AGHEZZAF EH, 1995, P INT C IND ENG PROD, P43
[2]   A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times [J].
Allahverdi, A ;
Al-Anzi, FS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 169 (03) :767-780
[3]   A review of scheduling research involving setup considerations [J].
Allahverdi, A ;
Gupta, JND ;
Aldowaisan, T .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02) :219-239
[4]   Group technology in a hybrid flowshop environment:: A case study [J].
Andrés, C ;
Albarracín, JM ;
Tormo, G ;
Vicens, E ;
García-Sabater, JP .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 167 (01) :272-281
[5]  
BENINI L, 2006, ALLOCATION SCHEDULIN
[6]  
Bitran G. R., 1990, Journal of Manufacturing and Operations Management, V3, P24
[7]  
Cardoso J., 2004, J WEB SEMANT, V1, P281, DOI [DOI 10.1016/J.WEBSEM.2004.03.001, 10.1016/j.websem.2004.03.001]
[8]   Total tardiness minimization on unrelated parallel machine scheduling with auxiliary equipment constraints [J].
Chen, JF ;
Wu, TH .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2006, 34 (01) :81-89
[9]  
CHEVALIER G, 1996, REV VERRE, V2, P27
[10]   A local search algorithm for jobshop scheduling problems with alternative operations and sequence-dependent setups [J].
Choi, IC ;
Choi, DS .
COMPUTERS & INDUSTRIAL ENGINEERING, 2002, 42 (01) :43-58