共 36 条
[1]
Abzalov M., 2016, APPL MINING GEOLOGY, P263, DOI DOI 10.1007/978-3-319-39264-6_19
[2]
Aghalayam P., 2010, HDB COMBUSTION, DOI [10.1002/9783527628148.hoc082, DOI 10.1002/9783527628148.HOC082]
[3]
[Anonymous], 2005, FAST LARG AN CONT ON
[4]
STATE ANALYSIS OF OVERWORKED AND UNDERWORKED PARTING BETWEEN CONTIGUOUS SEAMS AND DURING THEIR SIMULTANEOUS TOP-DOWN MINING
[J].
MINING OF MINERAL DEPOSITS,
2016, 10 (02)
:34-39
[6]
NUMERICAL METHODS OF GEOMECHANICS TASKS SOLUTION DURING COAL DEPOSITS' DEVELOPMENT
[J].
MINING OF MINERAL DEPOSITS,
2016, 10 (03)
:1-12
[7]
Busylo V, 2017, MIN MINER DEPOSITS, V11, P80, DOI 10.15407/mining11.01.080
[8]
Cundall P.A., 1992, Eng. Computation, V9, P101, DOI [10.1108/eb023851, 10.1016/B978-0-08-040615-2.50015-0, DOI 10.1108/EB023851]
[9]
DHATT G., 2012, Finite element method
[10]
ANALYTICAL INVESTIGATIONS OF MASSIVE STRESS IN THE ZONE OF DISJUNCTIVE FAULT INFLUENCE
[J].
MINING OF MINERAL DEPOSITS,
2014, 8 (03)
:361-365