Flow-shop problems with intermediate buffers

被引:54
作者
Brucker, P
Heitmann, S
Hurink, J
机构
[1] Univ Osnabruck, Dept Math Informat, D-49069 Osnabruck, Germany
[2] Univ Twente, Fac Elect Engn Math & Comp Sci, NL-7500 AE Enschede, Netherlands
关键词
flow-shop problem; buffer; tabu search;
D O I
10.1007/s00291-003-0133-7
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper the following extension of the classical flow-shop problem is considered: Between each two consecutive machines a buffer of limited capacity is given. After finishing processing on a machine, a job either directly has to be processed on the following machine or it has to be stored in the buffer between these machines. If the buffer is completely occupied the job may wait on its current machine but blocks this machine for other jobs. The objective is to determine a feasible schedule minimizing the makespan. To model such a problem setting, a variation of the classical disjunctive graph model for shop problems is extended. A tabu search procedure is described where neighborhoods based on an extension of the classical block approach theorem are used. Computational results for extended flow-shop benchmark instances are presented.
引用
收藏
页码:549 / 574
页数:26
相关论文
共 16 条
[1]  
Aarts E. H., 1994, ORSA Journal on Computing, V6, P118, DOI 10.1287/ijoc.6.2.118
[2]   A BRANCH-AND-BOUND ALGORITHM FOR THE JOB-SHOP SCHEDULING PROBLEM [J].
BRUCKER, P ;
JURISCH, B ;
SIEVERS, B .
DISCRETE APPLIED MATHEMATICS, 1994, 49 (1-3) :107-127
[3]  
Glover F., 1989, ORSA Journal on Computing, V1, P190, DOI [10.1287/ijoc.2.1.4, 10.1287/ijoc.1.3.190]
[4]  
Grabowski J., 1988, Przeglad Statystyczny, V35, P67
[5]   A BLOCK APPROACH FOR SINGLE-MACHINE SCHEDULING WITH RELEASE DATES AND DUE DATES [J].
GRABOWSKI, J ;
NOWICKI, E ;
ZDRZALKA, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1986, 26 (02) :278-285
[6]   A survey of machine scheduling problems with blocking and no-wait in process [J].
Hall, NG ;
Sriskandarajah, C .
OPERATIONS RESEARCH, 1996, 44 (03) :510-525
[7]   FLOWSHOP SEQUENCING PROBLEMS WITH LIMITED BUFFER STORAGE [J].
LEISTEN, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (11) :2085-2100
[8]  
LEISTEN R, 1985, EINBEZIEHUNG BESCHRA
[9]   A HEURISTIC ALGORITHM FOR THE M-MACHINE, N-JOB FLOWSHOP SEQUENCING PROBLEM [J].
NAWAZ, M ;
ENSCORE, EE ;
HAM, I .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1983, 11 (01) :91-95
[10]   A fast tabu search algorithm for the permutation flow-shop problem [J].
Nowicki, E ;
Smutnicki, C .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 91 (01) :160-175